Similar Projects
Longport Well - 4 Building
New Construction
Bidding
Longport, NJ

Longport Well - 4 Building
New Construction
Bidding
Longport, NJ

2020 Installation of Landfill Gas Wells ( Routine and Emergency)
Post-Bid
Egg Harbor Township, NJ 08234

Pump Station Maintenance and Wet Well Cleaning
Term Contract
Post-Bid
Egg Harbor Township, NJ 08234

2020 Redevelopment of Well No. 10
Results
Margate City, NJ 08402

Well #4 Construction
Results
Longport, NJ 08403

Well Maintenance and Redevelopment Services
Infrastructure
Bidding

Poplar Avenue Sewage Pump Station Rehabilitation
Renovation
Post-Bid
Linwood, NJ 08221

Maintenance Service and Repair of Brigantine`S Water Wells Sewer Lift Stations and Storm Pump Stations
Results
Brigantine, NJ 08203

2020 Emergency Sewer Pumps and Equipment
Term Contract
Post-Bid
Somers Point, NJ

Maintenance Pump Station Repair Contract, Statewide - 2021
Results
Less than $5,000,000 est. value

Well Testing, Sampling and Analysis
Results
Galloway, Pleasantville, NJ

Furnishing and Delivery of Four (4) Immersible Pumps for Spicer Avenue Station
Results
Pleasantville, NJ

2021 Sewer Pump Station Maintenance
Term Contract
Results
Somers Point, NJ

2021 Proposal Influent Grinders for Wastewater Stations
Term Contract
Results
Somers Point, NJ

Last Updated 11/22/2021 08:14 AM
Project Title

Pump Station Maintenance and Wet Well Cleaning Contract

Physical Address View project details and contacts
City, State (County) Egg Harbor Township, NJ   (Atlantic County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Pumps and Wells
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work for the Pump Station Maintenance and Wet Well Cleaning contract involves the establishment of rates for pump station wet well and basket cleanings along with hourly rates for maintenance jetting of sewer mains, bypass pumping, bar screen/basket fabrication, chemical treatment of pump stations and miscellaneous repairs. The contract will be in effect for a period of one (1) year with the possibility of two (2) one-year extensions if both parties agree to the extension.

Details

Lift and Pump Stations, Renovation.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties.
Division 11 - Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork.
Division 32 - Exterior Improvements, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents