Similar Projects
Westerra Homes Phases C & D
Infrastructure
Conception
Sequim, WA 98382

Rebuild and Reconductor Rocky Reach to Chelan Falls No. 1 Phase 2
Infrastructure
Bidding
$500,000 est. value
East Wenatchee, WA 98802

Fife Temporary Encampment
Infrastructure
Bidding
$300,000 est. value
Fife, WA 98424

Heavy Civil General Contractor/Construction Manager Services for Atlantic Base Yard Refurbishment Project
Infrastructure
Post-Bid
$22,000,000 est. value
Seattle, WA 98134

Tower Site Readiness Phase II Project
Infrastructure
Post-Bid
Camano Island, Darrington, Everett, Kingston, Marysville, Mountlake Terrace, WA 98208

North South Monument Site Development
New Construction, Infrastructure, Alteration
Results
Bremerton, WA

Water Main Relocation and Early Grading
Infrastructure
Results
Bellingham, WA

Veterans Park Enhancements
Renovation, Infrastructure
Bidding
$274,403 to $320,137 est. value
Lynnwood, WA

VA American Lake Phase 2 Site Development
Demolition, Term Contract, Infrastructure, Alteration
Post-Bid
$10,000,000 to $25,000,000 est. value
Tacoma, WA

Nisqually State Park Maintenance Building Phase 1
New Construction, Infrastructure, Alteration
Results
$1,289,979 est. value
Eatonville, WA 98328

Madison Combined Sewer Separation
Infrastructure
Bidding
$3,200,000 est. value
Monroe, WA

Aggregate Pier Ground Improvements
Infrastructure
Post-Bid
Federal Way, WA 98023

Generator Relocation and Contaminated Soil Cleanup
Infrastructure, Alteration
Results
$350,000 est. value
Tacoma, WA 98402

Process Water Reuse Facility (PWRF) Utility Extension (Phase 1)
Infrastructure
Bidding
$4,800,000 to $5,100,000 est. value
Pasco, WA 99301

Well Drilling
Infrastructure
Post-Bid
Bainbridge Island, WA

Reported 06/09/2022 12:00 AM
Project Title

Small Works Roster Vinland Elementary School-Minor Site Improvements

Physical Address View project details and contacts
City, State (County) Poulsbo, WA 98370   (Kitsap County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value $90,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Project consists of adding a new approx. S' wide gravel security corridor/ pathway around the treed partial perimeter ofVinland Elementary. This project will entail removal grubbing and tree removal as needed. Some chain-link fencing & gates will be added as shown. Additionally, new Asphalt & road markings will need to be added to support the modified bus driving lane. The awarded contractor will be responsible for furnishing all materials, prevailing wage labor, equipment and incidenta ls to fully perform all the work as outlined in both this ITB/RFP, scope of work, plans and specifications.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Clearing and Grubbing, Selective Tree and Shrub Removal and Trimming, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Paving Specialties, Pavement Markings, Fences and Gates, Chain Link Fences and Gates.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents