Similar Projects
Manchester Expressway Mixed-Use Development
New Construction, Infrastructure
Conception
$5,000,000 CJ est. value
Columbus, GA 31904

11th Avenue Triplex
New Construction, Infrastructure
Conception
$600,000 CJ est. value
Columbus, GA 31904

Infantry Road and Follow Me Trail Extension
Infrastructure
Design
$1,000,000 CJ est. value
Columbus, GA 31903

Infantry Road and Follow Me Trail Extension
Infrastructure
Design
$1,000,000 CJ est. value
Columbus, GA 31903

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Bidding
$25,000,000 CJ est. value
Seattle, WA 98174

Academic Building and 56 Bed Housing Units - Department of Juvenile Justice
New Construction, Infrastructure - 47,000 SF
Post-Bid
$26,900,000 CJ est. value
Columbus, GA 31820

Backflow Preventer Device Services
Alteration
Post-Bid
GA

Design-Build and Design-Bid-Build Indefinite-Delivery Indefinite-Quantity Multiple Award Construction Contract for Naval Facilities Engineering Command Southeast Area of Operations N69450-20-R-0097
Results
$20,000,000 to $100,000,000 est. value

Demolition and Site Clearance of Canty Homes Building 704
Demolition, Infrastructure
Results
$27,975 est. value
Columbus, GA 31903

Overburden Storage
New Construction, Infrastructure
Pending Verification
$1,500,000 CJ est. value
Columbus, GA 31808

Marriott Expansion / Columbus
Addition, New Construction, Renovation, Infrastructure
Pending Verification
$20,000,000 CJ est. value
Columbus, GA 31901

AFB International Pet Food Ingredients Facility
New Construction, Infrastructure
Conception
$79,000,000 CJ est. value
Columbus, GA 31901

RFQ Construction Manager - Muscogee County Jail
Addition, Demolition, Renovation, Infrastructure
Bidding
$150,000,000 CJ est. value
Columbus, GA 31901

Pipe Lining System With Trailer, Mix, Pump and Spray System
Infrastructure
Post-Bid
Columbus, GA

Last Updated 12/19/2022 07:07 AM
Project Title

Fort Benning Battalion Headquarters Construction

Physical Address View project details and contacts
City, State (County) Fort Benning, GA 31905   (Muscogee County)
Category(s) Government/Public, Heavy and Highway, Sewer and Water
Sub-Category(s) Military Facility, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $63,895,000 [brand] Estimate
Plans Available from General Contractor
Owner View project details and contacts
Architect View project details and contacts
Description

Contract Award Date: Dec 16, 2022 Contract Award Number: W912HN23C3001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: SBVUVJ2G3NL4 Contractor Awarded Name: SAUER CONSTRUCTION, LLC Contractor Awarded Address: Jacksonville, FL 32216-0952 USA Base and All Options Value (Total Contract Value): $63895000.00 As of December 5, 2022, a bid tabulation has not been published and the project has not been awarded. A timeline for award has not been confirmed. Description: PN92792 SOF Battalion Headquarters Construct a non-standard Battalion Operations Facility (approximately 92,000 SF) for a newly formed 75th Ranger Battalion at Fort Benning, GA. Primary facilities include administrative areas, operations area with a Sensitive Compartmented Information Facility (SCIF), a Ranger Operations Center (ROC), and Company Operations Facilities/Readiness Bays. Construction includes mechanical and electrical systems, information systems, fire protection and alarm systems, Intrusion Detection System (IDS), and Energy Monitoring Control Systems (EMCS).Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Period of Performance: 740 Calendar Days In accordance with DFARS 236.204(ii), the magnitude of construction for this project is between $25,000,000 and $100,000,000 .Evaluation Criteria: The contract will be solicited and procured via FAR Part 15 Contracting by Negotiation, Lowest Price Technically Acceptable (LPTA). GENERAL: This section comprises an explanation of the bid items identified in the bid schedule for each item of work. The Contractor shall bid the work under the applicable bid item for the specific areas identified in the bid schedule. All work specified herein shall be accomplished in accordance with the requirements of the technical provisions of the specifications and the contract drawings. 0001 Base-Construction SOF Battalion HQs to the 5-Ft Line, Complete. Furnish and install all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the construction of the SOF Battalion Headquarters in accordance with the solicitation documents. This line item shall include applicable power and pathway infrastructure for equipment, such as the audio-visual equipment, access control, and security systems. 0002 Base-Site Development and Hardstand, Complete. Furnish and install of all materials, plant, tools, labor costs, and other associated incidentals necessary to complete the site development, hardstand, and utilities in accordance with the solicitation documents. This CLIN does not include privatized utilities that are being designed and/or installed by others. Work shown to be completed by others is not in contract. 0003 Option 1 - Pedestrian Bridge and Vehicle Charging Stations, Complete. Provide a fully engineered clear span bridge of welded steel construction, and fully engineered concrete foundation system in accordance with the solicitation documents. Provide Electric Vehicle Charging Stations encompassing the conductors, including the ungrounded, grounded, and equipment grounding conductors and the electric vehicle connectors, attachment plugs, and all other fittings, devices, power outlets, or apparatus installed specifically for the purpose of delivering energy from the premises wiring to the electric vehicle (EV) in accordance with the solicitation documents. 0004 Option 2 - Escorts During Construction. Provide guard and escorts, and follow the procedure as noted in accordance with the solicitation documents to include Specification 01 14 00 Section 1.4.3.2 and 1.4.3.3 Escorts. A guard is required at the entrance of the construction site from the start of construction through the final acceptance by the Government. Another guard is required at the entrance of the S-2 Secure Area once the area is enclosed on exterior surfaces and prior to the start of interior rough-in in the S-2 Area until final acceptance by the Government. Escorts shall have line of sight to each worker within the S-2 Secure Area. Adjust the number of escorts or the number of workers as needed. 0005 Option 3 - Procurement and Installation of Furniture, Fixtures and Equipment. Procurement and Installation of Furniture, Fixtures & Equipment (FF&E) Package as listed Appendix U Furniture FF&E Procurement Data Sheets of the Comprehensive Interior Design. 1. PRE-AWARD INFORMATION: This Acquisition will be solicited using FAR part 15, Contract by Negotiation and is Full and Open Competition. The resultant Contract will be a Single, Firm Fixed-Price Contract for Project Number: PN92792 SOF Battalion Headquarters Fort Benning, GA. 2. BASIS FOR AWARD: Contract shall be awarded to the lowest priced technically acceptable responsive and responsible, contractor. PRIOR TO AWARD, IN ORDER TO BE DETERMINED RESPONSIVE AND RESPONSIBLE, A PROSPECTIVE OFFEROR MUST FURNISH THE FOLLOWING INFORMATION WITHIN THE ELECTRONICALLY SUBMITTED PROPOSAL:Standard Form 1442, completed and signed by an authorized person. Unit and Total Pricing for all line items in the bid schedule. (except CLINS marked "DO NOT BID THIS CLIN.") Failure to do so may result in rejection of an Offeror's proposal. Proposal Data Sheet (including DUNS and CAGE). Offerors are required to submit a bid guarantee for this project in accordance with FAR Clause 52.228-1, Bid Guarantee. An electronic copy of the bid guarantee must be submitted with the electronic proposal submission. Current Financial Statements (e.g. the last three years of financial statements, Annual Reports, Dun and Bradstreet ratings and/or number, etc.) Provide a list of all current contracts held, total dollar value, award date, anticipated completion, performance and payment bond amount. (The financial statement information will be protected from disclosure by the Contracting Officer.) Please note that the Offeror, shall submit a subcontracting plan pursuant to FAR 52.219-9 Alt II and AFARS Appendix DD (For Large Businesses Offerors only). It is required to be submitted with the proposal submission. Any applicable Teaming Agreements. prospective contractors submitting as a joint venture must provide the legal agreement forming the joint venture. Refer to Attachment 1 for additional guidance on the use of the PIEE Solicitation Module. For addition information on PIEE Vendor Access Instructions or PIEE Solicitation Module Frequently Asked Questions visit: https://dodprocurementtoolbox.com/site-pages/solicitation-module For additional instructions on how to post an offer, please refer to the Posting Offer demo: https://pieetraining.eb.mil/wbt/sol/Posting_Offer.pdf SOLICITATION NO.: W912HN22R3004 TITLE OF PROJECT: Project Number: PN92792 SOF Battalion Headquarters Fort Benning, GA. OFFEROR INQUIRY KEY: KGPQBX-WCCXK6 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Addendum #1-6 have been issued as of 4-29-2022.

Details

92,000 SF.
Division 03 - Concrete, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Metal Doors and Frames, Wood Doors, Plastic Doors, Specialty Doors and Frames, Entrances and Storefronts, Curtain Wall and Glazed Assemblies, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Partitions, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Flagpoles.
Division 12 - Furnishings, Window Treatments, Casework, Office Furniture, Multiple Seating.
Division 21 - Fire Suppression, Fire-Suppression Sprinkler Systems.
Division 22 - Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Planting Irrigation, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents