Similar Projects
Last Updated | 02/02/2023 10:07 AM |
Project Title | RFQ Design - Relocate Main Gate |
Physical Address | View project details and contacts |
City, State (County) | New Castle, DE 19720 (New Castle County) |
Category(s) | Professional Services |
Sub-Category(s) | Architectural, Engineering |
Contracting Method | Competitive Bids |
Project Status | Request for Qualifications, Construction start expected March 2024 |
Bids Due | View project details and contacts |
Estimated Value | $5,000,000 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Delaware Air National Guard (DEANG) is soliciting letters of interest from Architectural/Engineering (A&E) teams for professional services related to Deang Contract No. Jlws209094 - Delaware Air National Guard - A/E Services - Relocate Main Gate, New Castle, DE. The Delaware Air National Guard seeks professional services to perform design (Title 1 - Design) and construction administration (Title 2 - Construction Administration) for a new access road and entry control point at the Delaware Air National Guard Base, located in New Castle, Delaware. The project will include a two-lane access road, gatehouse, UFC compliant commercial vehicle inspection area with overhead protection, ID check with overhead protection, Passive Vehicle Guardrail and traffic control measures, and building information systems. Supporting facilities include electrical service, water and wastewater lines, storm drainage improvements, asphalt pavement and communication infrastructure. Heating and air conditioning will be provided by stand-alone systems. Antiterrorism measures include laminated glazing in reinforced frames and reinforced exterior doors. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Access for individuals with disabilities will be provided. Comprehensive building and furnishings related interior design services are not required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Design will be in accordance with latest issued version(s) of NGB/A40 issued Design Instruction(s), the latest published versions of Department of Defense (DOD) Unified Facilities Criteria (UFC)1-200- 01 "DoD Building Code" inclusive of all sub-referenced applicable core UFC's therein, UFC 1-200- 02 High Performance and Sustainable Building Requirements", UFC 4-010-01 "DoD Minimum Antiterrorism Standards for Buildings, Air National Guard Engineering Technical Letter (ANG ETL) 10-03 "ANG Design Objectives and Procedures, ANG ETL 12-06 "Design Meetings and Presentations", ANG ETL 12-07 "Preparation of Document Package", and ANG ETL 15-01-00 "ANG Design Policy". Latest published UFC's and ANG ETL's in effect prior to start of Type B Design will apply to the project. Provide all planning and engineering design coordination and consultation at applicable design stages to include, but not limited to, the Assistant USP&FO for Air (Real Property) for the 166th Airlift Wing of the Delaware Air National Guard ("Base Civil Engineer"), Delmarva Power (Electrical Utility Service Provider), Delmarva Gas (Gas Utility Service Provider), the Delaware River and Bay Authority (DRBA), Delaware Division of Facilities Management, and the Delaware Department of Transportation (DEL DOT), Delaware Natural Resources and Environmental Control (DNREC), New Castle County Sewer (Sewer Utility Service Provider), and Artesian Water (Water Utility Service Provider). Provide "Code and Criteria Review" Services where they become necessary under ANG ETL 10-03. Provide "Value Engineering" Services in accordance with ANG ETL 10-03. The awarded firm will provide all necessary documentation under the State of Delaware major capital improvement project process necessary for Department of Facilities Management (DFM) approval and bidding. This request for proposals ("RFP") is issued pursuant to 29 Del. C. 6981 and 6982. A mandatory pre-bid meeting is not required and will not be established for this project. Questions regarding this solicitation must be submitted in writing to larry.e.schrock.nfg@army.mil by 1:00 PM on Monday, February 13, 2023. Responses will be posted by Tuesday, February 21, 2023. Responses shall include, and evaluations will be based on: Demonstrated experience with providing Design/Bid/Build consulting services; strong consideration to be given to firms whose Design/Bid/Build consulting services have been performed on National Guard facilities (20%) Organizational structure (personnel) established for the project including sub-consultants (5%) Previous experience (frequency) working with aforementioned sub-consultants in providing similar type services. (15%) Defined approach firm/team will implement (10%) Experience with Public Works projects within the State of Delaware (15%) Geographical location of main or branch office that will be assigned to the project (15%) Knowledge of National Guard facilities, criteria and standards, including NGB design guides, pamphlet and manuals; knowledge of Unified Facilities Criteria (20%) The Delaware Air National Guard seeks to apportion work equitably to interested and qualified firms. The above criteria will be used to select a firm to perform these services. All information shall be submitted on GSA Forms 254 and 255, SF 330 or equivalent. Respondents are reminded that the project A&E for this work must be registered in the State of Delaware. Selected firms who reply will be given notice of times and dates for scheduled interviews. The method of Contractor Selection has not been Determined at this time. |
||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |