Similar Projects
RFP Design - Phase VI at The Cherry Island Landfill
Infrastructure
Bidding
$3,800,000 CJ est. value
Wilmington, DE 19809

RFP Design - Phase VI at The Cherry Island Landfill
Infrastructure
Bidding
$3,800,000 CJ est. value
Wilmington, DE 19809

National Guard Bureau, Region 3, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Post-Bid
$75,000 to $30,000,000 est. value

National Guard Bureau, Region 3, Architect and Engineering Indefinite Delivery Indefinite Quantity Contract for Vertical Projects
Post-Bid
$75,000 to $30,000,000 est. value

C--A/E Renovate Audiology #460-18-006
Renovation
Results
$500,000 to $1,000,000 est. value
Wilmington, DE 19805

C--A/E Renovate Audiology #460-18-006
Renovation
Results
$500,000 to $1,000,000 est. value
Wilmington, DE 19805

RFP Design - New Delaware Psychiatric Center Feasibility Study
Renovation
Bidding
$3,610,000 CJ est. value
New Castle, DE 19720

Traffic Engineering Services
Term Contract
Post-Bid

C--A and E Multi-Discipline for Implementation of Utilities Asset Management Systems for Navy Utilities Located Throughout the Naval Facilities Engineering Command Area of Responsibility, Worldwide.
Results
Less than $50,000,000 est. value

RFP - Environmental Services
Term Contract
Bidding
Wilmington, DE 19801

Construction Management Services for Esser Funded HVAC System Renovations
Term Contract
Post-Bid
Bear, DE

C--Commissioning Authority (CXA) Services for the EPA
Results
$25,000 to $100,000,000 est. value

RFP - Lead Abatement Project Designers
Term Contract
Bidding
New Castle, DE 19720

Watershed Engineering Professional Services
Infrastructure
Post-Bid

Y--460-19-005 | AE Upgrade Bldg One General Exhaust
Results
$1,000,000 to $2,000,000 est. value
Wilmington, DE 19805

Last Updated 02/02/2023 10:07 AM
Project Title

RFQ Design - Relocate Main Gate

Physical Address View project details and contacts
City, State (County) New Castle, DE 19720   (New Castle County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids
Project Status Request for Qualifications, Construction start expected March 2024
Bids Due View project details and contacts
Estimated Value $5,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Delaware Air National Guard (DEANG) is soliciting letters of interest from Architectural/Engineering (A&E) teams for professional services related to Deang Contract No. Jlws209094 - Delaware Air National Guard - A/E Services - Relocate Main Gate, New Castle, DE. The Delaware Air National Guard seeks professional services to perform design (Title 1 - Design) and construction administration (Title 2 - Construction Administration) for a new access road and entry control point at the Delaware Air National Guard Base, located in New Castle, Delaware. The project will include a two-lane access road, gatehouse, UFC compliant commercial vehicle inspection area with overhead protection, ID check with overhead protection, Passive Vehicle Guardrail and traffic control measures, and building information systems. Supporting facilities include electrical service, water and wastewater lines, storm drainage improvements, asphalt pavement and communication infrastructure. Heating and air conditioning will be provided by stand-alone systems. Antiterrorism measures include laminated glazing in reinforced frames and reinforced exterior doors. Sustainable Design and Development (SDD) and Energy Policy Act of 2005 (EPAct05) features will be provided. Access for individuals with disabilities will be provided. Comprehensive building and furnishings related interior design services are not required. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Design will be in accordance with latest issued version(s) of NGB/A40 issued Design Instruction(s), the latest published versions of Department of Defense (DOD) Unified Facilities Criteria (UFC)1-200- 01 "DoD Building Code" inclusive of all sub-referenced applicable core UFC's therein, UFC 1-200- 02 High Performance and Sustainable Building Requirements", UFC 4-010-01 "DoD Minimum Antiterrorism Standards for Buildings, Air National Guard Engineering Technical Letter (ANG ETL) 10-03 "ANG Design Objectives and Procedures, ANG ETL 12-06 "Design Meetings and Presentations", ANG ETL 12-07 "Preparation of Document Package", and ANG ETL 15-01-00 "ANG Design Policy". Latest published UFC's and ANG ETL's in effect prior to start of Type B Design will apply to the project. Provide all planning and engineering design coordination and consultation at applicable design stages to include, but not limited to, the Assistant USP&FO for Air (Real Property) for the 166th Airlift Wing of the Delaware Air National Guard ("Base Civil Engineer"), Delmarva Power (Electrical Utility Service Provider), Delmarva Gas (Gas Utility Service Provider), the Delaware River and Bay Authority (DRBA), Delaware Division of Facilities Management, and the Delaware Department of Transportation (DEL DOT), Delaware Natural Resources and Environmental Control (DNREC), New Castle County Sewer (Sewer Utility Service Provider), and Artesian Water (Water Utility Service Provider). Provide "Code and Criteria Review" Services where they become necessary under ANG ETL 10-03. Provide "Value Engineering" Services in accordance with ANG ETL 10-03. The awarded firm will provide all necessary documentation under the State of Delaware major capital improvement project process necessary for Department of Facilities Management (DFM) approval and bidding. This request for proposals ("RFP") is issued pursuant to 29 Del. C. 6981 and 6982. A mandatory pre-bid meeting is not required and will not be established for this project. Questions regarding this solicitation must be submitted in writing to larry.e.schrock.nfg@army.mil by 1:00 PM on Monday, February 13, 2023. Responses will be posted by Tuesday, February 21, 2023. Responses shall include, and evaluations will be based on: Demonstrated experience with providing Design/Bid/Build consulting services; strong consideration to be given to firms whose Design/Bid/Build consulting services have been performed on National Guard facilities (20%) Organizational structure (personnel) established for the project including sub-consultants (5%) Previous experience (frequency) working with aforementioned sub-consultants in providing similar type services. (15%) Defined approach firm/team will implement (10%) Experience with Public Works projects within the State of Delaware (15%) Geographical location of main or branch office that will be assigned to the project (15%) Knowledge of National Guard facilities, criteria and standards, including NGB design guides, pamphlet and manuals; knowledge of Unified Facilities Criteria (20%) The Delaware Air National Guard seeks to apportion work equitably to interested and qualified firms. The above criteria will be used to select a firm to perform these services. All information shall be submitted on GSA Forms 254 and 255, SF 330 or equivalent. Respondents are reminded that the project A&E for this work must be registered in the State of Delaware. Selected firms who reply will be given notice of times and dates for scheduled interviews. The method of Contractor Selection has not been Determined at this time.

Details

Division 01 - General Requirements.
Division 03 - Concrete.
Division 04 - Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 11 - Equipment.
Division 13 - Special Construction.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 25 - Integrated Automation.
Division 26 - Electrical.
Division 27 - Communications.
Division 31 - Earthwork.
Division 32 - Exterior Improvements.
Division 33 - Utilities.
Division 34 - Transportation.
Division 35 - Waterway and Marine Construction.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents