Similar Projects
Section 4 Walnut Street Bridge Pipe Restraint Replacement
Infrastructure
Bidding
$180,000 est. value
Somerville, MA

Fire Hydrants
Infrastructure
Bidding
Billerica, MA

Kenwood Water Distribution System
Term Contract
Post-Bid
Dracut, MA 01826

2020 Lead Water Service Replacement Program
Post-Bid
Less than $1,500,000 est. value
Winchester, MA

Temporary Potable Water Conveyance
Term Contract
Results
Littleton, MA 01460

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Water Main Cleaning and Lining on Main Street (Route 28)
Post-Bid
Less than $1,800,000 est. value
Stoneham, MA

2020 Water Main Improvements
Results
Less than $750,000 est. value
Melrose, MA 02176

Hanscom AFB Steam Traps
Post-Bid
Bedford, MA 01731

2020 Water System Improvements
Results
$1,800,000 est. value
Concord, MA 01742

Water Works Materials
Post-Bid
Cambridge, MA

Rehabilitation of WASM 3 Sections W11/W12/W16/51
Results
Less than $13,992,000 est. value
Arlington, Medford, Somerville, MA 02129

Furnish and Deliver Construction Materials for the Water Department
Post-Bid
Cambridge, MA 02139

Fire Hydrants
Results
Bedford, MA

Furnish and Deliver Water Meters for FY21
Term Contract
Post-Bid
Ayer, MA

Last Updated 10/21/2021 08:51 AM
Project Title

Advanced Metering Infrastructure (AMI) and Water Meter Installation Services

Physical Address View project details and contacts
City, State (County) Arlington, MA   (Middlesex County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,910,875
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work includes the furnishing of all labor, materials, equipment, and incidentals necessary to install approximately 12,300 AMI modules, install 3,500 water meters with high resolution electronic encoder registers, ranging in size from 5/8-inch to 3-inch, and complete building inspections at approximately 3,500 premises. The AMI modules will be purchased by the Municipal Agency through a separate supply contract. Installation shall include removing existing meters, registers, and automatic meter reading (AMR) modules, making wiring repairs and plumbing modifications where necessary, and furnishing all incidentals required to complete installations.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents