Similar Projects
Z2DZ--Renovate and Replace Pharmacy AHUs
Design
$1,000,000 to $5,000,000 est. value
Durham, NC 27705

Equipment Operation and Maintenance for The Central Energy Building, Naval Health Clinic, MCAS Cherry Point Nc
Design
Cherry Point, NC

HVAC Chemical Water and Drain Treatment Services at Durham County Facilities
Bidding
Durham, NC

Ledford Middle School Metal Retrofit Roofing Project
Bidding
Thomasville, NC 27361

US Cellular Center Mechanical/HVAC Renovation
Post-Bid
Asheville, NC

Durham City Hall HVAC and Electrical Renovations
Post-Bid
Durham, NC

56--Upgrade OA & Exhaust Fans Phase II(VA-19-00005148)
Demolition
Results
$500,000 to $1,000,000 est. value
Durham, NC 27705

Brinkley Building Cosmetology HVAC Upgrades
Results
Thomasville, NC

Ronald Wilson Reagan High School HVAC Replacement
Design
Pfafftown, NC 27040

Window Replacement and HVAC Upgrades
Bidding
Lexington, NC 27292

Davie County Administration Building Chiller Replacement Project
Post-Bid
Mocksville, NC 27028

HVAC Maintenance Contract
Term Contract
Results
Less than $713,590 est. value
Dunn, Erwin, Lillington, Spring Lake, NC 27546

Indoor Air Quality
Bidding
Durham, NC 27701

Guaranteed Energy Savings (Performance) Contracting Services
Post-Bid
Sparta, NC

HVAC Installation for Building B - Annex
Results
Less than $99,818 est. value
Bolivia, NC 28422

Last Updated 04/26/2021 08:43 AM
Project Title

Design-Build Services for Mechanical (HVAC) upgrades to the Durham Bulls Athletic Park

Physical Address View project details and contacts
City, State (County) Durham, NC 27701   (Durham County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Providing professional Mechanical design and construction services for Mechanical (HVAC) Up-Grades to the Durham Bulls Athletic Park (DBAP). To replace components of MEP systems to ensure that the timing of the replacement is planned with the end of their useful life. There are currently 3 Air Handlers, 1 Hot Water Boiler, 1 Hot Water Heater and some small miscellaneous terminal VAV boxes in the scope of work that were identified as targets to be replaced as part of this capital improvement plan. All components of the system will need to be updated with HVAC controls and connected to the existing building automation system.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents