Similar Projects
Howard Avenue Drainage Improvements - Phase II
Bidding
Less than $138,171 est. value
Dade City, FL 33525

Rehabilitation/Repair of Water Control Structures A-22, A-24 and one (1) BSL-2, Twin Culverts at the A-2 Pond
Infrastructure
Bidding
$1,600,000 est. value
Port Saint Lucie, FL

Canal Maintenance Services
Term Contract
Post-Bid
Miami, FL 33128

Teak Follow Boulevard North, Phases 1 and 2
Post-Bid
San Antonio, FL 33576

CBJTC North Tank Trail Emergency Repair
Results
Less than $350,000 est. value
Starke, FL

Sunbeam Road at Abbey Glen Circle Drainage Improvements
Results
Less than $185,395 est. value
Jacksonville, FL 32202

Washington County - Joiner Road Culvert Replacement
Infrastructure
Bidding
Chipley, FL 32428

Construction of the Poinciana High School Football Field Drainage Repairs
Post-Bid
Kissimmee, FL 34744

Valencia College School of Public Safety, Parking Lot Drain Repair
Results
Orlando, FL 32825

Savannas Preserve South Savannas Weir
Infrastructure
Bidding
$568,000 est. value
Jensen Beach, FL

Arcola Lakes - Bioretention Area
Post-Bid
Less than $98,000 est. value
Miami, FL 33147

Western Lake Phase I Drainage Improvements
Results
De Funiak Springs, FL 32433

Lido Street Drainage Improvements
Infrastructure
Bidding
$1,371,623 est. value
Orlando, FL 32807

Poitras East Master Infrastructure Phase 1B
Post-Bid
Orlando, FL

Parking Lot, Bus Loop and Associated Drainage Installed
Results
Less than $150,000 est. value
Dunedin, FL 34698

Reported 07/07/2021 12:00 AM
Project Title

Mexico Beach 15th Street Box Culvert Wingwall Repair

Physical Address View project details and contacts
City, State (County) Mexico Beach, FL   (Bay County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

The box culvert on 15th street was damaged in Hurricane Michael and additional damage occurred in Hurricane Sally. The repairs to the box culvert consist of headwall reconstruction and reattaching wingwalls. Additional repairs to the area include replacing guardrails, road repair, utility repair and backfilling areas of erosion along the ditch banks.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Culverts, Ponds and Reservoirs.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents