Similar Projects
Paving and Traffic Improvements
Post-Bid
$500,000 est. value
Houston, TX

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

Bank of America
Renovation - 2,187 SF
Construction
$500,000 est. value
Houston, TX 77011

Imperial Forest Section 5
Post-Bid
Houston, TX

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

First Commercial Bank
Renovation - 5,900 SF
Construction
$400,000 est. value
Houston, TX 77002

Paver Project - University Park Building 11
Post-Bid
Houston, TX

2020 Paving Improvements Project
Results
$344,000 est. value
Piney Point Village, TX 77063

Frost Bank
Renovation - 3,321 SF
Construction
$2,500,000 est. value
Baytown, TX 77521

Clearing and Grubbing for Black Oak Phase 2
Infrastructure
Post-Bid

Street Repair at Long Drive Townhomes
Results
Less than $132,554 est. value
Houston, TX 77087

First Liberty National Bank
New Construction - 3,144 SF
Construction
$1,700,000 est. value
Baytown, TX 77523

Last Updated 08/08/2022 10:36 AM
Project Title

Bank OZK

Physical Address View project details and contacts
City, State (County) Houston, TX 77021   (Harris County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Bank, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status Obtained from a credible source, Awaiting verification, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $2,500,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Scope: Small Commercial - Bank Branch. As of August 2022, information regarding general contractor selection has not been disclosed. Construction is expected to begin in the fall of 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

3,316 SF.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation.
Division 08 - Openings, Metal Doors and Frames, Special Function Doors, Entrances and Storefronts, Special Function Hardware, Special Function Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Partitions, Emergency Access and Information Cabinets, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Security Mirrors and Domes.
Division 11 - Equipment, Security, Detention, and Banking Equipment, Vault Equipment, Safe Deposit Boxes, Safes, Vault Ventilators, Teller and Service Equipment.
Division 12 - Furnishings, Art, Window Treatments, Specialty Casework, Bank Casework, Furniture, Office Furniture.
Division 13 - Special Construction, Vaults, Security Vaults.
Division 14 - Conveying Equipment, Pneumatic Tube Systems.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs, Gutters, Sidewalks, and Driveways, Curbs and Gutters, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents