Similar Projects
Polk-Quincy - 701048.0 - City of Topeka
Infrastructure
Conception
$7,000,000 est. value
Topeka, KS

South Kansas Avenue(4th to 6th Avenue) - 841095 - City of Topeka
Alteration
Conception
$892,045 est. value
Topeka, KS 66630

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

New Washburn Rural Middle School - 2022 Bond - Auburn Washburn Public Schools
New Construction, Infrastructure - 138,000 SF
Design
$48,647,000 CJ est. value
Mission, KS 66614

Polk-Quincy City-owned Utility Relocation
Infrastructure
Bidding
$3,000,000 CJ est. value
Topeka, KS 66606

Grading, Bridge and Surfacing
Infrastructure
Bidding
$2,000,000 CJ est. value
Silver Lake, KS 66539

South Topeka Blvd BNSF Rail Crossing Removal & Pavement Replacement
Infrastructure
Post-Bid
Topeka, KS

Upgrade ED Topeka Phase II
Renovation
Post-Bid
$1,000,000 to $5,000,000 est. value
Topeka, KS 66622

Street Maintenance
Infrastructure
Results
Topeka, KS 66630

Milling and HMA Overlay
Infrastructure
Results

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Replacing the Bridge on SW 61st Street Over Six-Mile Creek
Demolition, New Construction, Infrastructure
Construction
$863,802 CJ est. value
Topeka, KS 66610

Hill's Pet Nutrition Expansion / Project Prince
New Construction, Infrastructure
Pending Verification
$31,400,000 CJ est. value
Topeka, KS 66617

North Topeka Storage
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Topeka, KS 66608

South Topeka Boulevard from 15th to 21st - 701045 - City of Topeka
Infrastructure
Conception
$4,700,000 est. value
Topeka, KS 66630

Last Updated 06/12/2023 03:37 PM
Project Title

Adult Residential Center - Shawnee County

Physical Address View project details and contacts
City, State (County) Silver Lake, KS 66539   (Shawnee County)
Category(s) Government/Public, Heavy and Highway
Sub-Category(s) Misc. Buildings, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected February 2025
Bids Due View project details and contacts
Estimated Value $8,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is included in the Shawnee County Capital Improvement Plan fiscal years 2022-2029. As of June 12, 2023, further details regarding design and construction have not been identified. A firm timeline for construction has not been established; however funding is allotted to fiscal year 2025. A detailed scope has not been released. Purchase of appropriate property and construction (or renovation) of a 60-bed Adult Residential Center for the housing of eligible felony probationers. In addition to sleeping quarters, the facility would have programming rooms, offices, and common meeting areas within a secure perimeter. The facility would need to be constructed in a manner that will allow future expansion with a similar profile (modular construction). Costs are estimated from similar facilities constructed in other jurisdictions, as no budgetary bid has yet been obtained for this project. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents