Similar Projects
Fisher Street Water Purification Facility - Filed Sub-Bids
Results
Less than $5,000,000 est. value
Westborough, MA 01581

Worcester Challenge and Reach Academy Window/Door/Roof and Boiler Replacement - Sub-Bids
Results
Less than $4,800,000 est. value
Worcester, MA 01609

Northborough Town Hall Facade Repairs
Results
Less than $100,000 est. value
Northborough, MA

Parapet Cap Replacement - DCU Center / EAM
Results
Less than $50,000 est. value
Worcester, MA 01608

Oxford Public Library Building Envelope Restoration - Filed Sub Bids
Results
$140,000 est. value
Oxford, MA 01540

Bagg Hall Restoration - Filed Sub-Bid
Post-Bid
$1,050,000 est. value
Princeton, MA 01541

Pump Station Roof Replacement and Repairs - Filed Sub-Bids
Post-Bid
$240,000 est. value
Fitchburg, MA 01420

Roof Replacement at 1050 Webster Square Tower - Filed Sub Bids
Results
$1,048,295 est. value
Worcester, MA

Masonry Repair
Results
Sutton, MA 01590

Maintenance: Masonry Services/City
Term Contract
Results
Worcester, MA

Masonry Repairs, Massachusetts Veterans Memorial Cemetery - General Bids
Results
$620,473 est. value
Winchendon, MA 01475

Exterior Re-Pointing
Post-Bid
Athol, MA

Percival Hall Renovations - Phase 3 - Filed Sub Bid
Results
Less than $2,250,000 est. value
Fitchburg, MA

Oxford Public Library Building Envelope Restoration - General Bids
Results
Less than $140,000 est. value
Oxford, MA 01540

Central Fire Station Rear Entry Renovation - Sub-Bids
Results
$225,000 est. value
Leominster, MA

Reported 01/19/2019 12:00 AM
Project Title

Complete Stone Foundation Restoration and Waterproofing

Physical Address View project details and contacts
City, State (County) Lunenburg, MA   (Worcester County)
Category(s) Single Trades
Sub-Category(s) Masonry
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value $10,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description DCAMM Certification Required. Work Includes pressure wash foundation, repoint joints/holes, and apply two coats white waterproof coating of entire inside of basement. Repoint and fill all holes above grade exterior of foundation all around building using lime mortar.
Details
Division 04 - Masonry, Common Work Results for Masonry, Masonry Mortaring, Unit Masonry.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents