Similar Projects
Becknell Industrial - Building 1
New Construction - 315,000 SF
Conception
$10,000,000 CJ est. value
Greer, SC

Flex Space Building
New Construction - 30,000 SF
Conception
Summerville, SC 29483

DHL Commerce Park
- 1,700,000 SF
Design
Saint George, SC

Garlington North
New Construction
Design
Greenville, SC

USC Aiken Library Upfit for Advising Center
New Construction
Bidding
$65,000 to $80,000 est. value
Aiken, SC 29801

Lehotsky Hall Renovation
Renovation - 94,000 SF
Post-Bid
Less than $19,000,000 est. value
Clemson, SC

Pattillo Ingleside II
New Construction - 125,000 SF
Post-Bid
$10,000,000 CJ est. value
Ladson, SC 29456

Aiken Facility and Auxiliary Services Building
Results
$2,000,000 to $2,500,000 est. value
Aiken, SC 29801

Restroom Renovations
Renovation
Results
$600,000 to $850,000 est. value
Pendleton, SC

Limestone College Library & Student Center
New Construction - 65,000 SF
Construction
$13,300,000 est. value
Gaffney, SC

Piedmont Upstate Center for Advanced Manufacturing Excellence
New Construction - 44,000 SF
Construction
$8,000,000 to $13,400,000 est. value
Greenwood, SC

The Citadel Masterplan
Renovation
Pending Verification
Charleston, SC 29409

Class A Industrial Spec Building
New Construction - 208,000 SF
Conception
$10,000,000 CJ est. value
Dillon, SC

Barkley Commercial
New Construction - 80,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
North Charleston, SC

Portable Classroom
Post-Bid
Spartanburg, SC 29305

Last Updated 06/24/2021 12:44 PM
Project Title

Scc - Trb 87/92 Warehouse Reroof

Physical Address View project details and contacts
City, State (County) SC 29334   (Spartanburg County)
Category(s) Education, Industrial/Manufacturing
Sub-Category(s) College/University, Industrial Warehouse
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $150,000 to $300,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work covered by this contract includes furnishing all labor, materials, tools, devices, appliances, and equipment necessary to perform all the work described in the Contract Documents. All work is located at the Tyger River CEBED Campus of Spartanburg Community College, 1875 E. Main Street, Duncan, SC 29334.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Concrete Finishing, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Coiling Doors and Grilles, Entrances, Automatic Entrances, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Acoustical Ceiling Suspension Assemblies, Flooring, Painting.
Division 10 - Specialties, Visual Display Units, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Protective Covers, Flagpoles, Flags and Banners.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Soda Fountain Equipment, Coffee and Espresso Equipment, Ice Machines, Cleaning and Disposal Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Broadcast, Theater, and Stage Equipment, Athletic and Recreational Equipment, Athletic Equipment, Play Field Equipment and Structures, Exterior Court Athletic Equipment, Athletic Field Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Countertops, Rugs and Mats, Office Furniture, Seating, Institutional Furniture, Classroom Furniture, Library Furniture, Book Shelves, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Plumbing Insulation, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Roadway Lighting, Area Lighting, Flood Lighting, Exterior Athletic Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Access Control, Electronic Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Screening Devices, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents