Similar Projects
West Apron Expansion - Phase II
Bidding
Oak Island, NC

Install Runway 23R ILS Infrastructure
Bidding
$1,000,000 to $5,000,000 est. value
NC

Runway 5R-23L Rehabilitation Project, Construction Phase 4
Post-Bid
Greensboro, NC 27409

Taxiway B Rehabilitation-Phase 2
Post-Bid
$10,000,000 to $20,000,000 est. value
Morrisville, NC 27560

Apron Rehabilitation (Areas A, B and Half of C)
Results
Less than $790,990 est. value
Monroe, NC

Corporate Hangar Taxilane Rehabilitation Schedule I and Rehabilitate Fuel Farm Drive and Taxilane Schedule II
Results
Less than $743,576 est. value
Gastonia, NC 28056

Runway 4 Approach Clearing
Post-Bid
New Bern, NC 28562

West Ramp Expansion Phase II
Results
Charlotte, NC 28208

Update Markings on Taxiway F
Post-Bid
$25,000 to $100,000 est. value
Cherry Point, NC 28533

Runway 18C/36C Joint Sealant Replacement, Spall Repairs and Taxiway Shoulder Repair
Results
Charlotte, NC

North Aircraft Apron Pavement Rehabilitation
Post-Bid
Currituck, NC

Runway 5R-23L Repairs
Results
Less than $598,895 est. value
Raleigh, NC 27623

Taxiways D and A1 Resurfacing
Post-Bid
Raleigh, NC

Taxiway Shoulder Pavement Rehabilitation Phase I
Results
Charlotte, NC 28202

Airport - Partial Parallel Taxiway and Apron Expansion
Post-Bid
$3,500,000 to $3,800,000 est. value
Jefferson, NC 28640

Last Updated 03/06/2020 01:57 PM
Project Title

Parallel Taxiway Rehabilitation

Physical Address View project details and contacts
City, State (County) NC   (Wilkes County)
Category(s) Heavy and Highway
Sub-Category(s) Runways/Taxiways
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Schedule I will include a 3-inch asphalt overlay on the existing parallel taxiway and connector taxiways with isolated areas of full depth pavement repair. The pavement will be widened at the taxiway intersections to comply with current fillet taper requirements. The existing taxiway edge lighting will be replaced with a new edge lighting system to reflect the modified pavement edges. Schedule II is a reduced project scope that will include a 3-inch bituminous asphalt overlay of the existing parallel taxiway and connector taxiways (approximately 7,650 tons). The project also includes the removal and replacement of a 15” RCP storm pipe under the existing parallel taxiway.

Details

Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Turf and Grasses.
Division 34 - Transportation, Airfield Signaling and Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents