Similar Projects
Western Multiple Award Task Order Contract (MATOC) for Horizontal Construction
Design
$2,000 to $4,000,000,000 est. value
Tucson, Yuma, AZ - El Centro, San Diego, CA

AZ FLAP 202(2) Red Cloud Mine Road
Design
$1,500,000 to $2,500,000 est. value
Yuma, AZ

Indefinite Quantity (Idiq) Multiple Award Construction Contract (Macc) For Paving Projects At Various Government Installations Within The Navfac Sw Area Of Responsibility Including But Not Limited To California, Arizona, Nevada, Utah, Colorado, And New Mex
Post-Bid

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

AZ Flap 439(1) & 202(1), Martinez Lake & Red Cloud Mine Road
Results
Yuma, AZ

Zocalo Gardens Phases 2 and 3 Water Main and Roadway Improvements
Results
Somerton, AZ 85350

WAPA (DSW Region) General Site Work/Concrete Construction MATOC
Post-Bid

Highway 95 and Engler Avenue Intersection Improvements Project
Results
$900,000 est. value
Yuma, AZ 85365

County 16th Street to County 18th Street Intersection Improvements Project
Results
Yuma, AZ 85364

Pavement Rehabilitation
Results
Less than $17,500,000 est. value
Yuma, AZ 85364

Asphalt Sealant and Services
Term Contract
Results
Yuma, AZ

Pavement Preservation Services
Term Contract
Results
Less than $300,000 est. value
Yuma, AZ

AZ FTBR Levee Road (1) Pave Levee Road
Results
$1,000,000 to $2,000,000 est. value
Yuma, AZ 85364

Catalina Drive and Palo Verde Street Pavement Replacement
Results
Yuma, AZ

Cesar Chavez Avenue Reconstruction Project
Results
$1,000,000 to $1,300,000 est. value
Somerton, AZ

Last Updated 03/25/2021 05:00 AM
Project Title

2nd Avenue Reconstruction 8th Street to 13th Street

Physical Address View project details and contacts
City, State (County) Yuma, AZ 85364   (Yuma County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Project Description: Removal and replacement of pavement structural section; curb, gutter, and sidewalk; storm sewer and catch basin installation; manhole installation; and other incidental work. Replace pavement structural section of 2 nd Avenue from 8th St to 13th St. Replace sidewalk ramps and street signage. Install catch basins, storm manholes and high density polyethylene storm sewer pipe and connect to existing retention basin. Connect existing wa ter mains at cross streets. Install sanitary manhole. Adjust all manholes and water valves to grade. Install curb, gutter, sidewalk, and street lighting from 10 th St to 12th St.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents