Similar Projects
Jordan High School Stair Treads and Installation
Post-Bid
Sandy, UT

Stage Curtains - 4 Locations
Post-Bid
Holladay, Kearns, Salt Lake City, West Valley City, UT 84128

Z--660-18-250 "Emergent Fixes B.8 Canteen" Construction Services
Renovation
Results
Salt Lake City, UT 84148

Eastwood North Interior Coating Project
Results
Less than $175,000 est. value
Salt Lake City, UT

Sound Proof Booth`s for Marriot Library
Term Contract
Post-Bid
Salt Lake City, UT 84112

Casework - HCH IR Suite Remodel - Casework
Results
Less than $12,500 est. value
Salt Lake City, UT

University of Utah Guest House Wall Paper Installation
Term Contract
Post-Bid
Salt Lake City, UT 84112

Framing - HCH IR Suite Remodel - Framing/Hanging and Mudding
Results
Less than $170,000 est. value
Salt Lake City, UT 84112

Secure Entries Remodel - CHHS and HHS
Post-Bid
West Jordan, UT 84081

Alumni House Stair and Floor Replacement
Results
Less than $300,000 est. value
Salt Lake City, UT 84112

SLCC Interior Sign Replacement
Post-Bid
Less than $69,000 est. value
Salt Lake City, UT

5600 West Safety and Improvement
Results
$780,000 to $1,120,000 est. value
UT

Folding Wall Replacement
Post-Bid
Salt Lake City, UT 84112

Sheet Rock Garage
Results
Riverton, UT

Motorized Roller Shades for Midvalley Health Center
Results
Murray, UT

Reported 06/15/2019 12:00 AM
Project Title

Construction Hunter Elementary School Ceiling Tile Replacement

Physical Address View project details and contacts
City, State (County) Salt Lake City, UT 84120   (Salt Lake County)
Category(s) Single Trades
Sub-Category(s) Finishes/Interior
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description 1. Remove and dispose of existing drop in ceiling throughout building.Excluding office area. This involves approximately 28,000 square feet. This is only an estimate contractor will be responsible to verify Square footage. 2. All ceiling grid is to remain. 3. Replace all tile removed with USG 2310 Radar tile 4. Any ceiling grid damage caused by removal or installation will be the contractor’s responsibility to repair or replace. 5. Contractor will be responsible for cleaning up any debris created by removal and replacement of tile.
Details
Division 09 - Finishes.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents