Similar Projects
Oakland WWTP Sludge Thickening - 291091.00 0 - City of Topeka
Renovation
Conception
$3,598,000 est. value
Topeka, KS 66612

East Filters Rehabilitation Phase II - 281102.01 - City of Topeka
Renovation
Conception
$5,185,000 CJ est. value
Topeka, KS 66612

WTP2: Chemical Feed Modification - 5-C-026-20 - City of Olathe
Renovation, Infrastructure
Design
$2,390,000 CJ est. value
Lenexa, KS 66227

Kansas River WWTP - City of Lawrence
Renovation
Design
$70,000,000 CJ est. value
Lawrence, KS 66044

Replace the VC Septic Tank and Leach Field
Infrastructure
Bidding
$500,000 CJ est. value
Larned, KS 67550

Water System Improvements
Infrastructure
Bidding
$400,000 CJ est. value
Susank, KS 67544

SCADA System Maintenance and Integration Services
Term Contract
Post-Bid
Overland Park, KS 66224

Wastewater Treatment Plant SCADA Controls & Instrumentation Maintenance NBAF
Renovation
Post-Bid
Manhattan, KS 66506

Lakeside and Simmons Sewer Pump Station Improvements
Renovation
Results
Augusta, KS

Lift Station No. 2 Improvements
New Construction
Results
Emporia, KS

City of Wichita Northwest Water Facility (NWWF)
Addition
Construction
$20,000,000 CJ est. value
Wichita, KS 67203

Johnson County Wastewater Pump Station - City of Leawood
New Construction, Infrastructure
Pending Verification
$1,290,000 CJ est. value
Leawood, KS 66206

Johnson County Wastewater Pump Station - City of Leawood
New Construction, Infrastructure
Pending Verification
$500,000 CJ est. value
Leawood, KS 66211

Pump Station 16 Upstream Interceptor Rehab - MS-21-0022 - City of Lawrence
Infrastructure
Conception
$1,170,000 CJ est. value
Lawrence, KS 66044

Lift Station Improvements - City of Hutchinson
Infrastructure
Design
$2,750,000 CJ est. value
Hutchinson, KS 67501

Last Updated 04/11/2023 12:03 PM
Project Title

6 Primary Sludge Pump Replacements

Physical Address View project details and contacts
City, State (County) Topeka, KS 66616   (Shawnee County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected April 2023
Bids Due View project details and contacts
Estimated Value $213,988 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

project has cancelled due to the department placing a hold on the projec The City of Topeka is soliciting bids for the replacement and installation of six primary sludge pumps in Pump House II at the Oakland Wastewater Treatment Plant (OWWTP) to support operations of the Water Pollution Control Division of Utilities. Q And A Open2/16/2023 10:06:00 AM Q And A Close2/28/2023 11:00:00 AM Bid Bond Required Yes Bid Bond Percent 5 Bid Security Requirements: All bids must be accompanied by a cashier's check or a bid fond for not less than five percent (5%) of the amount bid, made payable to the City of Topeka, Kansas (Owner). The City Reserves the right to purchase additional rotary lobe style pumps at the bid price, subject to availability, within six months of the bid closing date. This bid event will result in the form of a six month contract with the awarded bidder, which will include six month fixed price for the City's right to order additional parts. Shipping: Material to be furnished shall be delivered F.O.B. destination, freight prepaid and allowed to the: Oakland Wastewater Treatment Plant, 1115 NE Poplar St., Topeka, KS 66616.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents