Similar Projects
St Elizabeths East - Phase II
New Construction - 256,000 SF
Conception
$10,000,000 CJ est. value
Washington, DC

Buzzard Point - Phase II
New Construction
Conception
Washington, DC 20003

The Yards Phase II - Parcel Q
New Construction - 315,000 SF
Design
$10,000,000 CJ est. value
Washington, DC 20003

International Square Complex
New Construction, Renovation
Design
Washington, DC 20006

Pension Benefit Guaranty Corporation Offices
Renovation - 433,000 SF
Post-Bid
Washington, DC 20024

Enlightened
Build-Out - 16,156 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20020

GSA 11 D/B 6th Floor Short Wing Modernization at the New Executive Office Building
Results
$1,000,000 to $5,000,000 est. value
Washington, DC

7th Floor Spec Suite
Renovation - 4,520 SF
Results
Washington, DC 20005

N Street Offices
Renovation
Construction
Washington, DC 20036

Reunion Square Development
New Construction - 421,100 SF
Construction
$10,000,000 CJ est. value
Washington, DC 20001

Menkiti Office Building Phase II
New Construction - 71,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20020

Gallaudet Parcel 2
New Construction - 40,310 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Washington, DC

The Wharf Development
New Construction, Demolition - 6,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Washington, DC 20024

MLK Gateway II
New Construction - 102,610 SF
Design
$10,000,000 CJ est. value
Washington, DC 20020

2100 M Street NW
New Construction, Renovation, Addition - 420,244 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Washington, DC 20037

Reported 12/11/2021 12:00 AM
Project Title

Rayburn House Office Building SCIF

Physical Address View project details and contacts
City, State (County) Washington, DC   (District of Columbia County)
Category(s) Commercial
Sub-Category(s) Office
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value $375,000 to $475,000
Plans Available from Federal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Rayburn House Office Building has space located on the Ground level that includes the demolition of existing basement space to be converted into a SCIF. The current area does not meet the ICD security standards provided by the CIA or USCP/Physical Security Division Requirements. The spaces fails to meet the physical and technical needs (staff can hear conversations through the existing walls inside and outside the SCIF) and HVVAC needs (system is inadequate to keep the room cool during large meetings). Provide a SCIF space for the AOC to include demolition and the removal of an existing double door, infill of existing CMU wall to create a single door secured opening, a new CMU dividing wall separating the space into two areas and the construction of a communications closet. New ACT and gyp-board ceilings, carpet, furring and soundproofing to all walls, new lighting, new doors, mechanical, electrical, telecommunications and data outlets.

Details

Office, Renovation.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Carpeting, Painting.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers.
Division 12 - Furnishings, Window Treatments, Casework, Rugs and Mats, Office Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents