Similar Projects
T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

T.B. Hanna Station Phase 2 - 23-PRK-008 - City of Raymore
Infrastructure
Conception
$332,000 CJ est. value
Raymore, MO 64083

The Other Place Office Development / Belton
New Construction, Infrastructure
Design
$2,500,000 CJ est. value
Belton, MO 64012

North Scott Avenue Improvements
Infrastructure
Bidding
$250,000 CJ est. value
Belton, MO 64012

North Scott Avenue Improvements
Infrastructure
Bidding
$250,000 CJ est. value
Belton, MO 64012

2022 Parking Lot Improvements
Infrastructure
Post-Bid
$200,000 est. value
Belton, MO

FY 23 Street Preservation Project
Infrastructure
Post-Bid
Belton, MO

Highway 58 Waterline Replacement
Infrastructure
Results
$313,900 CJ est. value
Raymore, MO 64083

2022 Curb and Gutter Program
Infrastructure
Results
Harrisonville, MO

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Chase Bank Facility and Take 5 Oil Change / Belton
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Belton, MO 64012

Good Parkway Improvements - 26-PRK-001 - City of Raymore
Infrastructure
Conception
$580,000 CJ est. value
Raymore, MO 64083

2022 Street Overlay, Curb Replacement, Storm Sewer Project
Infrastructure
Post-Bid
$220,000 est. value
Raymore, MO

Job Order Contract for Asphalt Pavement Repair
Infrastructure
Results
$2,500,000 to $5,000,000 est. value
Harrisonville, Platte City, MO

The Depot / Raymore
New Construction, Infrastructure
Pending Verification
$75,000,000 CJ est. value
Raymore, MO 64083

Last Updated 09/27/2023 10:01 AM
Project Title

Concrete Sidewalk Installation and Maintenance

Physical Address View project details and contacts
City, State (County) Peculiar, MO 64078   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $32,040 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

the installation and maintenance of sidewalks on North Main Street from Broadway to Center in Peculiar Project questions: All questions regarding the bidding of this project must be submitted to Monte Johnson, Public Works Director, City of Peculiar at (816) 779-2227 or (mjohnson@cityofpeculiar.com). All questions must be received (2) days prior to the bid opening. Installing a new concrete sidewalk along the west side of N Main Street from W Broadway to the Alleyway by the Municipal Parking Lot. This new section ofsidewalk is approximately 142 feet in length and 5 feet in width. 2. Repair and maintenance of the existing concrete sidewalk along the west side of N Main Street from the alleyway of the Municipal Parking Lot to Center Street. This section of sidewalk is approximately 145 feet in length and is 5 feet in width.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents