Similar Projects
Station 115 Parking Lot Concrete Repair
Post-Bid
UT 84006

DFCM Construction Pre-Qualification (General, Electrical, Mechanical, Roofing, Paving and Civil)
Post-Bid
Less than $3,500,000 est. value
Salt Lake City, UT 84129

Neighborhood ADA Ramp Upgrades
Results
Midvale, UT 84047

Sandy City 2020 Overlay Project
Results
Sandy, UT 84070

Paxton East Parking Lot
New Construction
Construction
$50,000 est. value
Salt Lake City, UT 84101

Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT

Mill and Overlay 2020 Project
Results
Murray, UT 84123

City Wide Park Walkway Safety SLC Library Plaza Paver Replacement
Post-Bid
Salt Lake City, UT 84111

Murray Signals Three Locations
Results
Murray, UT 84107

Median Curb
Post-Bid
UT

300 East (11400 South to 11800 South) Reconstruction Project
Results
Draper, UT 84020

11th Avenue Park Pavillion, Multi-Use Path and Signage
Post-Bid
Less than $360,000 est. value
Salt Lake City, UT

2021 High Density Mineral Bond
Results
South Jordan, UT 84095

Asphalt Pavement Repair
Post-Bid
UT

Salt Lake City Airport South Employee Parking Lot Rehabilitation
Results
Salt Lake City, UT 84114

Last Updated 11/18/2021 04:32 AM
Project Title

US-89; State St To 300 W and 400 S. To N. Temple Rehabilitation High Volume

Physical Address View project details and contacts
City, State (County) UT   (Salt Lake County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,500,000 to $3,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The principal items of work are as follows (for all items of work see attachment): HMA 1/2 inch Fine Graded (PG 64-34) Reconstruct Manhole (Rapid Set) Reconstruct Pedestrian Access Ramp - Single Access Corner

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents