Similar Projects
SMORE Trail Part II- Division Creek - C.8 - City of Big Bear Lake
Renovation, Alteration
Conception
$500,000 est. value
Big Bear City, CA 92314

Rathbun Creek Trailhead Restroom and Parking Lot - City of Big Bear Lake
Infrastructure
Conception
$660,000 est. value
Big Bear Lake, CA

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Pumalo Street Townhomes
New Construction, Infrastructure
Design
$4,500,000 est. value
San Bernardino, CA 92404

Construction of I-10 Cedar Avenue Improvement Project
Infrastructure
Bidding
$4,200,000 CJ est. value
San Bernardino, CA 92401

Pavement Rehabilitation
Infrastructure
Bidding
$856,850 CJ est. value
Loma Linda, CA 92354

CSA 70, R-40 Upper North Bay Road Chip Seal Project
Infrastructure
Sub-Bidding
$200,000 CJ est. value
San Bernardino, CA 92352

Street Striping and Pavement Marking Services
Infrastructure
Sub-Bidding
$300,000 CJ est. value
San Bernardino, CA 92401

Traffic Signalization, Street Light And Signing & Striping Improvements
Infrastructure
Post-Bid
$828,757 est. value
Ontario, CA 91761

Pavement Management Program Sector E Pavement Rehabilitation
Infrastructure
Post-Bid
Highland, CA 92346

Replace Pcc and Ac Pavement With Jpcp and Hma Pavement
Infrastructure
Results
CA

Saw Cutting, Asphalt Repair/Replacement, Slurry, and Paving
Infrastructure
Results
Yucaipa, CA 92399

San Bernardino County Transportation Tunnel
New Construction, Infrastructure
Pending Verification
$492,000,000 CJ est. value
Rancho Cucamonga, CA 91730

Southern California Edison Redlands Service Center
Addition, Demolition, New Construction, Infrastructure, Build-out - 30,469 SF
Pending Verification
$5,000,000 CJ est. value
Redlands, CA 92373

Village Drive And Stocker Road Sidewalk Improvements - City Of Big Bear Lake
Infrastructure
Conception
$275,000 est. value
Big Bear Lake, CA 92315

Last Updated 07/29/2022 12:42 AM
Project Title

Chino and Montclair Various Roads Overlay Project

Physical Address View project details and contacts
City, State (County) San Bernardino, CA   (San Bernardino County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results,
Bids Due View project details and contacts
Estimated Value $280,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Bidders shall complete and attach a fully executed proposal (P-1 to P-18) upon submitting their bid. Specifically, on page P-3 from the proposal documents, the bidder shall set forth for each unit basis item of work a unit price and a total for the item, and for each lump sum item a total for the item, all in clearly legible figures in the respective spaces provided for this purpose. In the case of unit basis items, the amount set forth under the "Total" column shall be the extension of the unit price bid on the basis of the estimated quantity for the item. In case of discrepancy between the unit price and the total set forth for a unit basis item, the unit price shall prevail, however, if the amount set forth as a unit price is ambiguous, unintelligible or uncertain for any cause, or is omitted, then the amount set forth in the "Total" column for the item shall prevail and shall be divided by the estimated quantity for the item and the price thus obtained, rounded to the next lower penny, shall be the unit price.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents