Similar Projects
Pavement Resufacing in Districts 4, 5 and 6
Bidding

2021 Road Projects
Bidding
New Boston, NH

2020 Paving Contract Bid Package
Post-Bid
Manchester, NH

Roadway Preservation on Various Roadways
Post-Bid
Less than $1,227,623 est. value

Pavement Resurfacing in District 5 and 6
Results
Less than $4,742,960 est. value
Allenstown, Amherst, Atkinson, Auburn, Barnstead, Barrington, Bedford, Boscawen, Bow, Brentwood, Brookline, Candia, Canterbury, Chester, Chichester, Concord, Deerfield, Derry, Dover, Dunbarton, Durham, Epsom, Goffstown, Hampstead, Henniker, Hollis, Hooksett, Hopkinton, Hudson, Litchfield, Londonderry, Manchester, Merrimack, Milford, Mont Vernon, Nashua, New Boston, New London, Northfield, Pelham, Pembroke, Pittsfield, Raymond, Salem, Sandown, Sutton, Tilton, Warner, Weare, Webster, Windham, NH 03811

Resufacing Various Tier 2 Roadways in District 2
Results
Less than $2,308,737 est. value

2020 Municipal Road Reconstruction
Post-Bid
Milford, NH

2020 Road Resurfacing
Term Contract
Results
Goffstown, NH

Multi-Road Construction - 2021 Construction Season
Post-Bid
Amherst, NH

2020 Paving Program Contract (1)
Results
Nashua, NH

Cold Planing and Resurfacing - On Call Services
Results
Manchester, NH

Reclaiming
Results
Manchester, NH

Chip Sealing
Results
Manchester, NH

Fog Seal Treatments
Results
Manchester, NH

Cold In Place Recycling
Results
Manchester, NH

Last Updated 05/04/2020 10:05 AM
Project Title

Sargent Camp Road Shim Bid

Physical Address View project details and contacts
City, State (County) Hancock, NH   (Hillsborough County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

1. This work shall consist of the delivery and placement of NH DOT shim mix, hot asphalt pavement. Prior to the application of hot mix asphalt a tack coat of emulsion will be applied to the areas to be shimmed. Rolling with a minimum 3-5 ton roller will commence as soon as the hot asphalt has reached its optimum rolling temperature. The contractor will mill a connection key at both ends of project area. The area of work is 2,700 feet long and 18.5 feet wide. 2. Materials: Hot asphalt will conform to NH DOT 3/8 inch surface treatment shim mix 3. Equipment will consist of a mechanical paver with a track drive system. A 3-5 ton roller, and a tack truck or wagon suitable to perform as needed. Or Equivalent 4. The location and estimated tonnage is as follows: Sargent Camp Road – 350 Tons 5. All tonnages are estimates and may be more or less when the actual work is completed. Payment will be made on actual tonnage in place. Budgets and proposal cost will dictate how much tonnage is accomplished. 6. Proposals must remain in effect for 30 days from the opening. 7. The Town of Hancock will discuss weather related delays or postponements with the contractor. If the contractor chooses to move forward with impending weather issues, they will do so at their own risk. The Town will not pay for loads on trucks that cannot be placed due to rain or other inclement weather.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents