Similar Projects
San Antonio Avenue Transmission Water Main, Phase 2- 8th Street 30-inch and 36-inch Diameter Transmission Water Main
Infrastructure
Bidding
$4,765,200 est. value
Rancho Cucamonga, CA 91730

Backflow Testing, Repair and Certification Service
Term Contract
Bidding
$72,000 est. value
Chino, CA 91710

Modular Classroom Restroom Addition At Haynes Elementary School
Renovation
Post-Bid
Ontario, CA 91762

California Village Infrastructure Project
Infrastructure
Post-Bid
Needles, CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Z1da--Service-Renovate Domestic Water Piping Projects FMS
Term Contract
Results
$5,000,000 to $10,000,000 est. value
Loma Linda, CA

Etiwanda Pipeline North Relining - Stage 3
Infrastructure
Bidding
$17,000,000 to $21,000,000 est. value
Rancho Cucamonga, CA 91739

Rock House VC Waterline Construction
Term Contract
Post-Bid
$40,000 to $50,000 est. value
Earp, CA 92242

District Wide HVAC Replacements 11 Campuses (COVID) - Plumbing
Alteration
Results
$1,000,000 est. value
Hesperia, CA 92344

Pipeline Replacement Project Area 1 and 2
Infrastructure
Bidding
$2,800,000 to $3,000,000 est. value
Victorville, CA

Well 11 - Raw Water Transmission Main Project (Project WA-211)
Infrastructure
Post-Bid
$2,754,510 est. value
Chino, CA 91710

Victorville Water District Meter Endpoints
Alteration
Results
Victorville, CA

On-Call and Emergency Repair Services including Water and Sewer Systems
Infrastructure
Post-Bid
Chino Hills, CA

2021 CIP Water Pipeline Replacement Project
Infrastructure
Results
$4,000,000 est. value
Redlands, CA 92373

Plumbing Services
Alteration
Post-Bid
Chino, CA

Reported 06/02/2022 12:00 AM
Project Title

General Services Plumbing Fixture Replacement and Water Re-Piping Services

Physical Address View project details and contacts
City, State (County) Highland, CA 92346   (San Bernardino County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Plumbing, Water Lines
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected July 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Contractor shall provide all personnel, labor, tools, supplies, materials, machinery, equipment, properly equipped vehicles, trucks, dumpsters, safety gear, licenses, permits, hauling, transportation, disposal, and insurances necessary to perform the work stated herein to replace the plumbing at the General Services Building.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents