Similar Projects
Twin Valley Road Improvements Governor Dodge State Park
Infrastructure
Construction
$1,790,500 CJ est. value
Middleton, WI 53562

Construction of the Main Street to Second Street Alley Utility and Pavement Improvements
Infrastructure
Results
$229,265 CJ est. value
Delavan, WI 53115

2022 Street Program and Fontana Boulevard Irrigation System
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Fontana, WI 53125

Wood Street Project
Infrastructure
Results
$67,689 CJ est. value
Walworth, WI 53184

2022 Sewer Rehabilitation
Infrastructure
Post-Bid
$550,000 CJ est. value
Elkhorn, WI 53121

Sharon Nelson Street Sanitary Sewer and Street Replacement
Infrastructure
Post-Bid
$649,381 CJ est. value
Sharon, WI 53585

St. Patrick's Church
Addition, Demolition, New Construction, Infrastructure - 9,278 SF
Design
$3,500,000 CJ est. value
Elkhorn, WI 53121

Schwager Drive Reconstruction
Infrastructure
Pending Verification
$1,538,400 CJ est. value
Whitewater, WI 53190

IH 43 Rock Freeway - Wisconsin Department of Transportation
Infrastructure
Post-Bid
$30,000,000 CJ est. value
Elkhorn, WI 53121

The White Elephant Building Redevelopment
Build-out
Design
$1,000,000 CJ est. value
Whitewater, WI 53190

Dollar General / Whitewater
New Construction, Infrastructure - 10,640 SF
Pending Verification
$2,800,000 CJ est. value
Whitewater, WI 53190

Repaving
Infrastructure
Post-Bid
$320,000 CJ est. value
La Grange, WI 53190

Tropical Smoothie
New Construction, Infrastructure
Pending Verification
$250,000 CJ est. value
Delavan, WI 53115

Taco Bell Restaurant / Elkhorn
New Construction, Infrastructure
Pending Verification
$250,000 CJ est. value
Elkhorn, WI 53121

C. Elkhorn, Market Street, STH 11 to STH 67
Infrastructure
Bidding
$2,000,000 CJ est. value
Elkhorn, WI 53121

Last Updated 11/01/2022 05:32 PM
Project Title

North Tratt Street Apartments Phase II

Physical Address View project details and contacts
City, State (County) Whitewater, WI 53190   (Walworth County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Site Development
Contracting Method Bids by Invitation
Project Status Construction start expected December 2022
Bids Due View project details and contacts
Estimated Value $18,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans call for the construction of apartments. As of November 1, 2022, this project has obtained CUP approval. Information regarding the selection of an architect and general contractor has not been released. While a firm construction timeline has not yet been established, construction is expected to begin in the fourth quarter 2022. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

New Construction, New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents