Similar Projects
Last Updated | 10/29/2021 03:28 PM |
Project Title | Advanced Individual Training (AIT) Complex Barracks Phase 3, Fort Gordon |
Physical Address | View project details and contacts |
City, State (County) | Fort Gordon, GA 30905 (Richmond County) |
Category(s) | Commercial |
Sub-Category(s) | Communication Building |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | $25,000,000 to $100,000,000 |
Plans Available from | Federal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Construct a standard design battalion sized Advanced Individual Training (AIT) Complex, to include battalion headquarters (BNHQ), barracks/company operations facility (B/COF) for 600 soldiers, a running track, physical training pits, building information systems, fire protection and alarm systems, video surveillance system installation, Intrusion Detection System (IDS) installation, Electronic Security System (ESS) installation, and Energy Monitoring Control Systems (EMCS) connection. Supporting facilities include site development, utilities and connections, lighting, paving, parking, walks, curbs and gutters, storm drainage, information systems, landscaping and signage. Heating and air conditioning will be provided by connection to the existing energy plant. Building information systems for this project are unique in nature and not included in the unit cost of the building. Measures in accordance with the Department of Defense (DoD) Minimum Antiterrorism for Buildings standards will be provided. Comprehensive building and furnishings related interior design services are required. Access for individuals with disabilities will be provided. Cyber Security Measures will be incorporated into this project. Sustainability/Energy measures will be provided. Facilities will be designed to a minimum life of 40 years in accordance with DoD's Unified Facilities Criteria (UFC 1-200-02) including energy efficiencies, building envelope and integrated building systems performance. Air Conditioning (Estimated 467 Tons). |
||||||||||||||||||||||||||||||||||||
Details | 1 Communication Building, Approximately 139,392 SF New Construction Building.
|
||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |