Similar Projects
HMA Resurfacing With Milling - I-35
Infrastructure
Design
$500,000 CJ est. value
Latimer, IA 50452

HMA Resurfacing With Milling - I-35
Infrastructure
Design
$500,000 CJ est. value
Latimer, IA 50452

HMA Resurfacing With Milling
Infrastructure
Bidding
$2,000,000 CJ est. value
Coulter, IA 50452

HMA Resurfacing With Milling
Infrastructure
Bidding
$2,000,000 CJ est. value
Coulter, IA 50452

Peace Plaza
New Construction, Infrastructure
Post-Bid
Hampton, IA 50441

Family Dollar / Hampton
New Construction, Infrastructure - 10,431 SF
Post-Bid
$500,000 CJ est. value
Hampton, IA 50441

PCC Patching
Infrastructure
Results

Granular Surfacing of Roadway
Infrastructure
Results

2022-2023 Street Rehabilitation Program
Infrastructure
Results
$2,000,000 est. value
Hampton, IA 50441

Beeds Lake Pit Latrine by Boat Ramp Rebid
Infrastructure
Results
$58,790 CJ est. value
Unincorporated, IA 50441

Culvert Maintenance Work on Sheffield Access in Franklin County
Infrastructure
Results
$8,625 CJ est. value
Coulter, IA 50452

HMA Resurfacing/cold in-place Recycling
Infrastructure
Results
$4,194,438 CJ est. value
Hansell, IA 50441

RCB Culvert New - Twin Box
Infrastructure
Results
$268,231 CJ est. value
Latimer, IA 50452

Bridge Deck Overlay
Infrastructure
Results
$1,143,588 CJ est. value
Coulter, IA 50452

Last Updated 02/08/2023 03:04 PM
Project Title

Storm Drainage Improvements

Physical Address View project details and contacts
City, State (County) Latimer, IA 50452   (Franklin County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

Work under this project consists of approximately 5,400 feet of 24-inch through 12-inch storm drainage pipe (base bid and add alternate combined); approximately 10 manholes (base bid and add alternate combined); approximately 29 intakes; approximately 4,200 square yards of ACC pavement; seeding; along with appurtenant work. This work is shown in detail on the construction plans on file with the City Clerk. All bids must be filed on or before the Noon deadline previously stated. All bids shall be made on forms furnished by the City and must be enclosed in a separate sealed envelope and plainly identified. The City Council of Latimer, Iowa, will hold a public hearing on the proposed plans, specifications, form of contract and estimate of cost for the construction of said improvements in accordance with the provisions of Chapter 384, Code of Iowa, at 6:30 PM, on the 8th day of February, 2023, at City Hall in Latimer, Iowa. At said hearing any interested person may appear and file objections to the project and cost thereof Each proposal shall be accompanied by a bid bond, cashiers or certified check, or a credit union certified share draft, in a separate sealed envelope in an amount equal to ten percent (10%) of the total amount of the proposal. The certified or cashiers check shall be drawn on a bank in Iowa or a bank chartered under the laws of the United States or said certified share draft should be drawn on a credit union in Iowa or chartered under the laws of the United States; and such check or share draft shall be made payable to the City Clerk, City of Latimer, Iowa, as a security that if awarded a contract, the Bidder will enter into a contract at the prices bid and furnish the required performance and payment bond and certificate of insurance. The certified or cashiers check or certified share draft may be cashed, or the bid bond redeemed, if the Contractor fails to enter into a contract, or fails to provide a certificate of insurance within ten (10) days after the acceptance of his proposal by resolution of Council. No bidder may withdraw a bid within sixty (60) days after the date set for opening bids. The City reserves the right to reject any and all bids, to waive informalities and technicalities. The Council reserves the right to defer acceptance of any proposal for a period not to exceed sixty (60) calendar days after the date bids are to be received. If awarded, one (1) contract will be awarded to the lowest responsible, responsive bidder for Base Bid with add or replacement alternates or Alternate Bid with add or replacement alternates based on the amount of work and type of materials selected by the City. Liquidated damages in the amount of $1,000.00 per calendar day will be assessed for each day that work remains uncompleted after the deadline set below. Contractor shall begin work within ten days of the Owners Notice to Proceed, and work shall proceed continuously until completed. Work must be completed by December 1st , 2023. The successful bidder shall furnish a Performance Bond in an amount equal to one hundred percent (100%) of the contract price, said bond to be issued by a responsible surety and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and shall guarantee the prompt payment for all materials and labor and protect and save harmless the City from claims and damages of any kind caused by the operation of the Contractor. In addition, the bond shall guarantee against defects in materials or workmanship for a period of two years after completion and acceptance by the City. By virtue of statutory authority, preference will be given to products and provisions grown and coal produced within the State of Iowa and to Iowa domestic labor to the extent lawfully required under Iowa statues. Payments will be made to the Contractor based on monthly estimates in amounts equal to ninety-five percent (95%) of the contract value of the work completed, including materials and equipment delivered to the job site during the preceding calendar month, and will be based upon an estimate prepared on the twenty-fifth (25th) day of each month by the Contractor, subject to the approval of the Engineer. Such monthly payment will in no way be construed as an act of acceptance for any part of the work partially or totally completed. The balance of the five percent (5%) due the Contractor will be paid not earlier than thirty-one (31) days from the date of final acceptance of said work by the City, subject to the conditions and in accordance with the provisions of Chapter 573 of the Code of Iowa, as amended. No such partial or final payment will be due until the Contractor has certified to the City Clerk that the materials, labor, and services involved in each estimate have been paid for in accordance with the requirements stated in the specifications. Payments shall be made in cash from funds on hand; money from the sale of Bonds; or other monies which can be legally used for this work.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents