Similar Projects
Delbarton School Ice-Skating Rink
Renovation
Conception
Morristown, NJ 07960

Rutgers University Athletic Facilities
Renovation
Conception
Piscataway, NJ 08854

Lake Campus North at Princeton Univesity
New Construction - 510,000 SF
Design
$10,000,000 CJ est. value
West Windsor, NJ

Planet Fitness
Build-Out - 16,603 SF
Bidding
Passaic, NJ 07055

Pine Gate Apartments - Fitness Center/Maintenance Shop
Renovation - 1,493 SF
Post-Bid
Old Bridge, NJ 08857

LA Fitness
Renovation - 41,000 SF
Post-Bid
North Brunswick Township, NJ 08902

New Field House Project at Randolph Township High School
New Construction, Demolition - 40,000 SF
Results
Randolph, NJ 07869

Hanover Park High School and Whippany Park High School Athletic - Complex Refurbishment - Phase 2
Results
East Hanover, Whippany, NJ

Cornerstone at Howell
New Construction
Construction
$22,600,000 est. value
Howell, NJ 07731

Princeton Charter School
Addition - 25,579 SF
Construction
$4,000,000 est. value
Princeton, NJ 08540

Planet Fitness
Build-Out - 13,993 SF
Post-Bid
Hackettstown, NJ 07840

New Dugouts at Sparta High School
Results
Sparta, NJ 07871

Gunnell Oval Improvements
Construction
Kearny, NJ

Athletic Facilities Improvements at Southern Regional High School
Post-Bid
Manahawkin, NJ 08050

Bauerle Field House Renovation, Phase - 1
Renovation
Results
Paterson, NJ 07501

Last Updated 05/20/2021 12:06 PM
Project Title

Johnson Park Sports Facility Improvements Phase 1A

Physical Address View project details and contacts
City, State (County) Hackensack, NJ   (Bergen County)
Category(s) Entertainment/Recreation
Sub-Category(s) Athletic Facility
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work will include but is not limited to, the construction of approximately one thousand four hundred sixty four linear feet (1,563 LF) of storm drainage piping throughout Johnson Park ranging in size from 15 inches to 24 inches, one (1) reconstructed drainage structure, twelve (12) new drainage structures, utility relocations, four hundred ten (410) linear feet of sanitary sewer piping, 24" diameter, three (3) new sanitary sewer structures, temporary sanitary sewer bypass piping and pumping, 3,972 SY Dense Graded Aggregate, 12" Thick, stripping, stockpiling and sampling and classification of surface soils and excavated materials, and surface restoration including 1,526 SY topsoiling, fertilizing, seeding, and mulching

Details

Division 01 - General Requirements, Construction Facilities.
Division 03 - Concrete, Concrete Forming, Concrete Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings.
Division 09 - Finishes, Painting.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 31 - Earthwork, Site Clearing, Earth Moving.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Athletic and Recreational Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents