Similar Projects
Last Updated | 09/18/2023 08:32 AM |
Project Title | Exit 298 Sewer Lift Station & Force Main |
Physical Address | View project details and contacts |
City, State (County) | Elko, NV 89801 (Elko County) |
Category(s) | Heavy and Highway, Sewer and Water |
Sub-Category(s) | Lift and Pump Stations, Site Development |
Contracting Method | Competitive Bids |
Project Status | Bidding, Construction start expected December 2023 |
Bids Due | View project details and contacts |
Estimated Value | $4,820,000 [brand] Estimate |
Plans Available from | Municipal Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is located along SR-535 beginning east of I-80 Exit 298 and terminating near Hot Springs Road. The primary scope of work includes a new 400 gpm sewer lift station and parallel sewer force mains with provisions for future buildout to 1,500 gpm. Lift station work includes site grading, installation of precast concrete wet well and dry pit structures with depths of approx. 20-FT; three 15 horsepower sewage pumps and discharge piping; yard piping, valves, and fittings, a flow meter and air valve vault; pig launching stations; electrical and controls; and all associated appurtenances. Force main work includes over 11,500 LF each of 6-inch and 10-inch HDPE piping, air valve assemblies, a waterline relocation, and connections to the City s existing gravity sewer system. The force main piping requires a trenchless crossing under SR-535 and open-cut construction within UPRR rightof-way. All bidders shall be registered with the Elko City Clerk s Office on the official plan holder s list for this project prior to submitting bids for this project. All bidders shall attend the mandatory Pre-Bid Conference for the Project at the time and location stated below to be eligible to submit a construction bid. Bid proposals must be submitted on the prescribed forms and accompanied by security in the amount, form and subject to the conditions listed in the Instructions to Bidders. Bid proposals will be opened at City Hall immediately after the above deadline, with the bid amounts submitted being read aloud by City Staff to the interested parties present, if any. All interested parties are invited to be in attendance at the bid opening. Contractors will be required to have a current Elko City business license prior to time of contract execution; moreover, a current Nevada State contractor s license of the proper classification to perform the project work is required at the time of the Project bid opening. All bids must be submitted in a sealed envelope that is legibly marked EXIT 298 SEWER LIFT STATION & FORCE MAIN . City staff shall thoroughly review all bid proposals for conformance with the contract documents prior to making a written recommendation for award to the Elko City Council. The award will be made to the lowest responsive and responsible bidder to the extent and in the manner required by law, unless all bids are rejected. The lowest responsive and responsible bidder shall be determined on the basis of price, conformance to plans and/or specifications, the bidder's qualifications, conformance to applicable sections of NRS Chapter 338, and the best interest of the public. The City Council may formally award the contract to the successful bidder at its regularly scheduled meeting at City Hall on Tuesday October 10th, after 4 P.M, Local Time. The City Council may, in its sole discretion, reject all bids. LABOR COMMISSIONER: The Nevada Labor Commissioner s identifying project number is PWPEL-2023-474 for this project. NRS 338.013(1) requires the Labor Commissioner s identifying number to be included in any bid or other document submitted in response to the advertisement or other type of solicitation. The City of Elko reserves the right to accept or reject any and/or all items specified in the bid proposal and further reserves the right to waive any minor technicalities in the bidding documents. |
||||||||||||||||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |