Similar Projects
Mixed-Use Development
New Construction - 204,000 SF
Conception
$10,000,000 CJ est. value
Alexandria, VA 22314

Fairfax Peak Indoor Ski Resort
New Construction - 500,000 SF
Conception
$10,000,000 CJ est. value
Lorton, VA

Cavalier Inn Project
New Construction
Design
Charlottesville, VA 22904

Holiday Inn Rosslyn Redevelopment
New Construction, Build-Out, Demolition - 774,100 SF
Design
$10,000,000 CJ est. value
Arlington, VA 22209

Hotel and Conference Center
New Construction - 25,000 SF
Post-Bid
Charlottesville, VA 22903

Development of 0.9 Acres in Downtown Culpeper at the Corners of East Davis Street and Commerce Street
New Construction - 31,000 SF
Post-Bid
Culpeper, VA 22701

New River Trail State Park Renovation of Foster Falls Hotel
Renovation - 12,000 SF
Results
Foster, VA 24360

Home2 Suites
New Construction
Construction
$2,000,000 est. value
Glen Allen, VA

Homewood Suites By Hilton
Renovation - 5,284 SF
Construction
Springfield, VA 22150

Potomac Yard Landbay C-East
New Construction - 519,001 SF
Pending Verification
Arlington, VA

The Zone at Greenbrier Mall
New Construction - 183,000 SF
Pending Verification
$80,000,000 est. value
Chesapeake, VA 23320

Northfax West Mixed Use
New Construction
Conception
Fairfax, VA 22030

Little City Commons
New Construction - 516,400 SF
Design
$10,000,000 CJ est. value
Falls Church, VA

Hilton Alexandria Mark Center
Renovation
Post-Bid
$8,000,000 to $10,000,000 est. value
Alexandria, VA 22311

Residences At 805 King Street
Renovation - 9,664 SF
Construction
$1,400,000 est. value
Alexandria, VA 22314

Reported 01/07/2022 04:40 PM
Project Title

Hyatt Place Plaza

Physical Address View project details and contacts
City, State (County) Harrisonburg, VA 22801   (Harrisonburg City County)
Category(s) Commercial
Sub-Category(s) Hotel/Motel
Contracting Method
Project Status Building in Operation as of December 2021
Bids Due View project details and contacts
Estimated Value $8,000,000 to $1,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Hotel/Motel, 78,205 SF New Construction, 123 Unit(s), 5 Stories Above Grade, New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents