Similar Projects
NTP Vertical Turbine Pump Rebuild
Bidding
Brighton, CO 80603

Colorado City Artesian Well 4584-F
Bidding
Colorado City, CO

Water Right Due Diligence - Arkansas River Basin
Post-Bid
Denver, CO

Carmichael Park Vault
Post-Bid
Brighton, CO 80601

2019 Alluvial Well Improvements
Results
Less than $2,000,000 est. value
Commerce City, CO

Repair by Replacing Domestic Water Pumps B420
Results
$1,000,000 to $5,000,000 est. value
Colorado Springs, CO

Non-Potable Pond Pump Station
Construction
Brighton, CO 80601

MMAARS 6 Well Project
Bidding
Denver, CO

South Suburban Littleton Golf Course Well # 1
Post-Bid
Littleton, CO

Six Denver Basin Aquifer Wells Drilling Project
Results
Denver, CO

Directional Boring and Trenching
Bidding
Fort Collins, CO

On Call Alluvial Well Maintenance & Repair
Post-Bid
Castle Rock, CO

EC, Provide Sump Pump and Controls
Results
Loveland, CO 80537

2020 On Call Deep Well Repair
Post-Bid
Castle Rock, CO 80109

2020 Well Maintenance Project
Results
Less than $279,000 est. value
Aurora, CO 80016

Reported 02/15/2020 12:00 AM
Project Title

South Suburban Parks and Recreation Littleton Golf Course Well Pump, Piping & Controls

Physical Address View project details and contacts
City, State (County) Littleton, CO 80540   (Arapahoe County)
Category(s) Sewer and Water
Sub-Category(s) Pumps and Wells
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Consultant
Owner View project details and contacts
Architect View project details and contacts
Description

Generally includes furnishing and installing a 20 HP submersible pump and motor, hanging pitless adaptor, controls with variable speed drive, approximately 270 feet of 10 in diameter PVC to connect the new well to a new meter vault, flowmeter, actuated control valves , level sensors, and SCADA and remote operation appurtenances. Approximately 600 feet of 480V electrical will also be installed in conduit from an existing pump house to power the well. Finally, the old well will be abandoned in place per State standards.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Cast-in-Place Concrete.
Division 22 - Plumbing, Plumbing Piping, Plumbing Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems.
Division 33 - Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wells.
Division 44 - Pollution and Waste Control Equipment, Water Pollution Control Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents