Similar Projects
US 50 / Latrobe Road / El Dorado Hills Boulevard Interchange Improvements Phase 2B - 36104001 - El Dorado County
Infrastructure
Conception
$7,620,000 CJ est. value
Placerville, CA 95667

Ice House Road Pavement Rehabilitation - Phase 3 - 36105068 - El Dorado County
Infrastructure
Conception
$2,533,000 CJ est. value
Kyburz, CA 95720

Multifamily Construction
Infrastructure, Renovation
Design
South Lake Tahoe, CA 96150

SpringHill Suites / Placerville
New Construction, Infrastructure
Design
$28,000,000 CJ est. value
Placerville, CA 95667

2023 ADA Upgrade Projects
Infrastructure
Bidding
$158,000 CJ est. value
South Lake Tahoe, CA 96150

GAOA Dru Barner Campground Improvements
Infrastructure, Renovation
Bidding
$500,000 CJ est. value
Georgetown, CA 95634

Flume 45 Section 3 Replacement - El Dorado Irrigation District
Infrastructure
Post-Bid
$11,000,000 CJ est. value
Placerville, CA 95667

Construction of a Parking Garage
New Construction, Infrastructure
Post-Bid
South Lake Tahoe, CA 96150

Old Depot Bike Park
Renovation
Results
Placerville, CA 95667

EWWTP Well 3 Drilling
Infrastructure
Results
$587,085 CJ est. value
Elmira, CA 95625

Motherlode Forcemain Replacement Program - El Dorado Irrigation District
Renovation, Infrastructure
Construction
$15,000,000 CJ est. value
Placerville, CA 95667

Ponte Palermo Phase 2
New Construction, Infrastructure - 115,650 SF
Pending Verification
$23,200,000 CJ est. value
Cameron Park, CA 95682

The Landing at Tahoe Resort and Spa Cabins Addition
New Construction, Infrastructure
Pending Verification
$4,000,000 CJ est. value
South Lake Tahoe, CA 96150

Ice House Road Pavement Rehabilitation Phase 2 - 36105023 - El Dorado County
Infrastructure
Conception
$20,320,000 CJ est. value
Kyburz, CA 95720

Bucks Bar Road at the North Fork Cosumnes River - Bridge Replacement - 77116 - El Dorado County
Demolition, New Construction, Infrastructure
Design
$10,388,000 CJ est. value
Placerville, CA 95667

Last Updated 08/11/2023 11:03 PM
Project Title

Sly Park Day-Use Area Stabilization

Physical Address View project details and contacts
City, State (County) Pollock Pines, CA 95726   (El Dorado County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $286,990 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

District will receive Bids in two opaque sealed envelopes or other packages labeled Envelope "A" and Envelope "B," each containing the respective items described in paragraphs 4 and 5 below. All Bid envelopes will be time stamped to reflect their submittal time.Envelope "A" shall be due by 3:00 p.m., local time, August 8, 2023 and Envelope "B" shall be due by 3:00 p.m., local time, August 10, 2023 The work shall consist of slope and shoreline stabilization including grading and clearing trees and shrubs for placement of rock slope protection and slope restoration. Bidding Documents contain the full description of the Work. A California Classification A contractors license is required. Questions regarding this project should be directed to the Project Manager by emailing Ms. Madeline Kelsch at mkelsch@eid.org, or by calling 530.642.4182. The project is a public works project subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR). To be qualified for this project, acontractor must be registered with the DIR In addition, pursuant to prevailing wage laws, copies of the prevailing wage rates are on file at the Districts principal office and are available on request. Contractor shall submit a comprehensive written Health and Safety Plan (HSP) as specified herein within 10 days from the Notice of Award. The Health and Safety Plan required to be submitted herein must be favorably reviewed by District prior to Contractor starting Work. CONTRACT TIME. Work shall be finally completed within 90 calendar Days from the date when Contract Time commences to run Engineers Estimate is $291,000.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents