Similar Projects
Encore at Johnstown
New Construction, Infrastructure
Conception
$50,000,000 CJ est. value
Johnstown, CO 80534

Bellvue Two Million Gallon Clearwell - N39 - City of Greeley
Infrastructure
Conception
$5,250,000 CJ est. value
Greeley, CO 80639

The Flaming Gorge Project
New Construction, Infrastructure
Design
$1,000,000,000 CJ est. value
Greeley, CO 80631

Flying Circle Retail Development
New Construction, Infrastructure
Design
$1,000,000 CJ est. value
Dacono, CO 80514

South Canyon West Road Project
Infrastructure
Bidding
$500,000 CJ est. value
New Raymer, CO 80742

Intersection Improvements
Infrastructure
Bidding
$5,000,000 CJ est. value
Mead, CO 80542

Godding Creek CLOMR: Firestone
Infrastructure
Post-Bid
Firestone, CO 80520

Oligarchy Ditch Relocation Project
Infrastructure
Post-Bid
CO

Summit View Spillway Improvements
Infrastructure
Results
Severance, CO

River Run Pond
Infrastructure
Results
Greeley, CO

Fossil Creek Ranch - Filing 1 & 2
Construction
Windsor, CO

Immaculata Plaza II (New Build) and I (Renovation)
New Construction, Renovation, Infrastructure
Construction
$1,000,000 CJ est. value
Greeley, CO 80631

Residence Inn by Marriott
New Construction, Infrastructure
Pending Verification
$5,000,000 CJ est. value
Greeley, CO 80634

Greeley Apartment / HP Site
New Construction, Infrastructure
Pending Verification
$25,000,000 CJ est. value
Greeley, CO 80634

Linn Grove Cemetery Roadway Repairs - 304.1527 - City of Greeley
Infrastructure
Conception
$345,000 CJ est. value
Greeley, CO 80631

Last Updated 01/25/2023 05:33 PM
Project Title

Milton Seaman Outlet Works Evaluation - 11225 - City of Greeley

Physical Address View project details and contacts
City, State (County) Greeley, CO 80631   (Weld County)
Category(s) Heavy and Highway
Sub-Category(s) Shoreline/Erosion/Drainage, Site Development
Contracting Method Competitive Bids
Project Status Conceptual Design, Construction start expected September 2026
Bids Due View project details and contacts
Estimated Value $4,868,909 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Complete design and construction of replacement outlet gates and engineering evaluation to determine if a multi-outlet tower can be integrated at a later time to the proposed design of the outlet gates replacement project. As of January 25, 2023, this project is included in the City of Greeley's FY 2023 - 2027 CIP an funding is allotted for 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents