Similar Projects
Islamic Society Funeral Home
New Construction - 5,000 SF
Design
$375,000 est. value
Lincoln University, PA 19352

Islamic Society of Delaware Cemetery
New Construction
Design
Oxford, PA 19363

Earth Excavation and Snow Removal
Bidding
Pittsburgh, PA

Stream Restoration of Espy Run Segment A
New Construction - 1,000 SF
Post-Bid
Nanticoke, PA 18634

Humboldt Industrial Park North
New Construction
Post-Bid
Hazleton, PA 18201

Berks Park 183 Aviation Road and Site Utilities Phase One Contract 2
Results
Reading, PA 18100

Addition and Site Improvements
Results
Gibsonia, PA

Hamburg Commerce Park
New Construction - 2,400,000 SF
Construction
$80,000,000 est. value
Hamburg, PA 19555

Bliss Bank Area Phase II - Site Reclamation
Renovation
Construction
Ashley, PA 18706

Lake In Wood RV Resort Campground and Comfort Station
New Construction - 3,200 SF
Design
$5,000,000 est. value
Narvon, PA 17555

Construction Activities 2018
Post-Bid
Ebensburg, PA

Final Site Improvements for Site 2 at Autoport
Results
Philadelphia, PA

PASSI Site Work
Construction
$500,000 est. value
Philadelphia, PA 19126

Porches At Allenberry
Design
Boiling Springs, PA 17007

Abington Friends School
Post-Bid
Jenkintown, PA

Last Updated 11/30/2018 11:33 AM
Project Title

Construction of Median Islands

Physical Address View project details and contacts
City, State (County) Exton, PA 19341   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Site Development
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $30,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description The Work shall include furnishing materials, equipment, and labor for the construction of four (4) median islands per these specifications, the details provided, and as directed. a)Each island will be 6 ft. wide and 70 ft. long at the locations specified. The exact location shall be field verified with the Township prior to initiation of work. b)Work will include furnishing of materials and all work necessary to provide complete median islands including, but not limited to: Saw cutting, Excavation, Suitable backfill and topsoil, Belgian Block curbing with concrete setting bed, Three trees per island, Mulch, Signs and posts. c)Traffic Control.
Details
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 33 - Utilities.
Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents