Project Title | Mill Creek Elementary School Phase 1 HVAC Renovation |
Physical Address | View project details and contacts |
City, State (County) | Louisville, KY 40216 (Jefferson County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project consists of the following: The Architectural scope of work includes but is not limited to: a new secured main entrance vestibule, complete re-roof, replacement of penthouse wall panel system, new exterior windows, interior renovations, miscellaneous flooring upgrades, localized brick tuckpointing, full ceiling replacement and other work to accommodate the new HVAC system. The Mechanical/Electrical/Plumbing scope of work includes replacing the HVAC system in the school. New chiller, air handlers, and associate pumps will be installed. A new sprinkler system will be installed throughout. Plumbing upgrades for ADA accessibility. New electrical switchgear and distribution equipment will be provided along with new light fixtures and the associated electrical system renovations required for the mechanical systems upgrade. Other electrical system upgrades include an emergency generator replacement, intercom, security, fire alarm, network data, and other miscellaneous low-voltage system replacements/upgrades. |
||||||||||||||||||||||||||||||||
Details |
|
||||||||||||||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |