Similar Projects
D7 Olney Maintenance Yard Liquid Asphalt Storage Tank
Infrastructure
Bidding
$70,000 CJ est. value
Olney, IL 62450

17th Street and Boot Camp Water Tank Repairs and Repaint
Renovation
Bidding
$915,000 CJ est. value
Murphysboro, IL 62966

Fuel Tank Removal and Replacement
Post-Bid
Waukegan, IL 60087

Gallon Double Ellipse (Division Street) Exterior Overcoat, Mixer Installation, and Misc. Repairs
Post-Bid
Mundelein, IL 60060

New Ground Water Storage Tank
New Construction, Demolition
Results
Loda, IL 60948

Southwest Tank Rehabilitation
Results
Belvidere, IL

North Shore Water Reclamation District Administration Building Hot Water Pipe and Shutoff Valve
Renovation
Bidding
$300,000 CJ est. value
Gurnee, IL 60031

Test and Repair Underground Storage Tanks
Term Contract
Post-Bid
Chicago, IL

Elevated Water Storage Tank
Results
Grayslake, IL

Sodium Bisulfite Storage Tank Replacement
Renovation
Bidding
$550,000 CJ est. value
Chicago Heights, IL 60411

H335--Underground Storage Tank Inspection and Maintenance Services
Term Contract
Post-Bid
Hines, IL 60141

Briar Lane Elevated Water Storage Tank Maintenance and Repainting
Infrastructure
Results
Less than $564,800 est. value
Oak Forest, IL

Underground Storage Tank Replacement
Renovation
Bidding
$1,000,000 CJ est. value
Urbana, IL 61802

Logistics FY22 Underground Storage Tank Inspections-JTR
Alteration
Post-Bid
Springfield, IL

Phase V System Improvements Elevated Water Storage Tank Contract "L"
Alteration
Results
Less than $1,050,000 est. value
IL

Last Updated 09/12/2022 02:40 PM
Project Title

200,000 Gallon Elevated Water Storage Tank Rehabilitation

Physical Address View project details and contacts
City, State (County) Lexington, IL 61753   (McLean County)
Category(s) Sewer and Water
Sub-Category(s) Storage/Water Tanks
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected May 2022
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Project includes the following Work: Rehabilitation of the interior and exterior elevated tank coatings. The Project is expected to be completed on or before September 30, 2022, and an alternate completion date is being bid allowing the Project to be completed on or before September 30, 2023. A pre-bid conference for the Project will NOT be held. A certified check or bank draft payable to the order of City Clerk, Lexington, Illinois, or a satisfactory Bid Bond executed by the Bidder and an acceptable surety in an amount equal to five percent (5%) of the total Base Bid for the Divisions bid shall be submitted with each Bid. For all further requirements regarding bid submittal, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents. Bids will be held for a period of thirty (30) days subsequent to the opening of Bids.

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete.
Division 05 - Metals, Structural Metal Framing, Metal Decking.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Facility Fuel Piping, Facility Fuel-Storage Tanks.
Division 31 - Earthwork, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Fences and Gates.
Division 33 - Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents