Similar Projects
Last Updated | 01/03/2022 10:06 AM |
Project Title | Elementary School Air Conditioning Phase VI |
Physical Address | View project details and contacts |
City, State (County) | Aurora, IL (DuPage County) |
Category(s) | Single Trades |
Sub-Category(s) | HVAC |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Installation of a new roof top air handling unit. The Project consists of installing a new roof top unit at each school, along with any and all associated piping, ventilation, electrical and temperature control work. After the new system is up and running, the contractor will also be required to demo two existing above ceiling air handling units at each school, along with any and all associated piping, ventilation, electrical and temperature control work |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |