Similar Projects
Club Fitness Roof and HVAC Replacement
Post-Bid
Addison, IL 60101

Semi-Annual Duct, Hood and Fan Cleaning
Post-Bid
Wheaton, IL 60187

Westmont Regional Center Roof Top Unit Replacement
Results
Westmont, IL 60559

City Hall HVAC Upgrades
Results
Elmhurst, IL 60126

Coroner's Office Refrigerator and Freezer Replacement
Post-Bid
Wheaton, IL 60187

2020 Prairie Building HVAC
Results
Wheaton, IL 60187

HVAC System Startup and Preventative Maintenance 2021-2023
Term Contract
Post-Bid
Elmhurst, IL 60126

HVAC Controls and Hardware Upgrades
Results
West Chicago, IL 60185

Annual HVAC Maintenance Contract
Term Contract
Post-Bid
Lombard, IL

RTU and Bleacher Replacement at Lisle Senior High School
Results
Lisle, IL 60532

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Wood Dale Fire Station 69 - Repairs and Maintenance Improvement
Results
Less than $350,000 est. value
Wood Dale, IL

Design Phase and Construction Administration Services
Post-Bid
Glen Ellyn, IL

Filter Building Repairs
Results
Wheaton, IL

HVAC and Mechanical Products
Term Contract
Post-Bid

Last Updated 01/03/2022 10:06 AM
Project Title

Elementary School Air Conditioning Phase VI

Physical Address View project details and contacts
City, State (County) Aurora, IL   (DuPage County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Installation of a new roof top air handling unit. The Project consists of installing a new roof top unit at each school, along with any and all associated piping, ventilation, electrical and temperature control work. After the new system is up and running, the contractor will also be required to demo two existing above ceiling air handling units at each school, along with any and all associated piping, ventilation, electrical and temperature control work

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents