Similar Projects
Avenues Three and One Sewer and Water Main Replacement
Infrastructure
Bidding
San Bruno, CA

Gladys Drive and Vicinity Main Replacement
Infrastructure
Bidding
$5,150,000 est. value
Pleasant Hill, CA

Valve Inspection Maintenance and Repair Services
Term Contract, Alteration
Post-Bid
Santa Clara, CA

Professional Engineering Services For Water System Improvements In Madera County Maintenance District No. 36 Eastin Arcola
Infrastructure
Post-Bid
Madera, CA

8-Inch and 12-Inch Ductile Iron Water Main Replacement
Infrastructure
Results
$7,500,000 to $9,000,000 est. value
San Francisco, CA

Renovation of the Existing Underground Steam Distribution System
Infrastructure
Results
$13,222,600 est. value
Yountville, CA 94599

Pipeline Valve and Safe Entry Improvements Phase 1A
Infrastructure
Bidding
$16,000,000 est. value
San Francisco, CA

Locating Subsurface Facilities
Alteration
Post-Bid
Riverside, CA 92519

Hydronic Valve Replacement
Infrastructure
Results
Channel Islands Beach, CA

Waterline Improvements
Infrastructure
Bidding
$11,019,000 est. value
Hayward, CA 94545

Water System Repair
Alteration
Post-Bid
Placerville, CA 95667

North Long Beach Collection Main Control Valve Upgrade
Infrastructure
Results
$1,116,000 est. value
Long Beach, CA 90899

Construction of the Extraction Well Pipelines
Infrastructure
Bidding
Woodland Park, CO

Victorville Water District Meter Endpoints
Alteration
Post-Bid
Victorville, CA

3rd Street, Buena Mesa Drive, and Calimesa Boulevard 24" Recycled Water Pipeline
Infrastructure
Results
$4,000,000 to $6,000,000 est. value
Calimesa, Yucaipa, CA 92399

Last Updated 01/07/2022 04:42 PM
Project Title

Miscellaneous Water Vault Rehabilitations - Nos. 10, 25, 49, and 94

Physical Address View project details and contacts
City, State (County) Anaheim, CA 92805   (Orange County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,100,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This work consists of the rehabilitation of four (4) water transmission line vaults, to include replacement of valves, piping, fittings, and connections to existing concrete cylinder pipe (CCP) ranging from 14-inches through 36-inches in diameter. Other elements include vault structural and electrical improvements, lead based paint testing and abatement if needed, asphalt paving, sidewalk, curb & gutter, landscaping disturbed by construction and any appurtenant work needed to complete project scope.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents