Last Updated | 03/02/2021 08:53 AM |
Project Title | Ferris Triangle Park Improvements |
Physical Address | View project details and contacts |
City, State (County) | Jersey City, NJ 07307 (Hudson County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Park/Playground |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | 1. Salvage, removal and disposal of existing site improvements, as designated on the drawings, that include but are not necessarily limited to; clearing and grubbing, complete tree removal, excavation, drainage lines, bituminous pavement, fencing, concrete sidewalk concrete curb, concrete / masonry walls, concrete slab, concrete wall footings and concrete deck. 2. Earthwork. Excavation for conduit, water lines, drainage lines, site grading. 3. Installation of new water tap and service line from existing main and/or meter pit, including water meter, meter pit, backflow preventer, stainless steel enclosures, ground hydrants and all associated plumbing components to deliver fully operational systems. Include fully permitted, compliant traffic control in accordance with JC Division of Engineering and Traffic. 4. Installation of new site furnishings (play structures, fitness structures, benches, trash cans, etc.) as specified or as shown on the drawings. 5. Installation of new stainless steel enclosures for new electrical services, including, but not limited to, panels, pumps, flag light, controllers, and ‘P-docs; to deliver fully operational systems. 6. Installation of new concrete, walls, curbing and flatwork including colored concrete surfaces as designated and specified. 7. Preparation and installation of specified landscaping items, including but not limited to: decorative metal fencing, gates, large caliper trees, landscaping and flag. 8. Flag pole installation, signage fabrication and installation and other Work indicated in the Contract Documents. 9. Acquisition of all necessary permit(s) from various agencies having authority. |
||||||||
Details |
|
||||||||
Bidder's List | View project details and contacts | ||||||||
Prospective Bidders | View project details and contacts | ||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |