Similar Projects
RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Conception
$1,500,000 CJ est. value
Seattle, WA 98174

Pods Storage Facility
New Construction - 52,800 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Santa Fe, NM 87501

U-Haul
New Construction - 90,000 SF
Design
Los Lunas, NM 87031

Roadway Reconstruction
Infrastructure
Bidding
$10,000,000 CJ est. value
Tierra Amarilla, NM 87551

Roadway Reconstruction
Infrastructure
Bidding
$10,000,000 CJ est. value
Tierra Amarilla, NM 87551

General Aviation Area Fence Improvements
Infrastructure
Sub-Bidding
$50,000 CJ est. value
Albuquerque, NM 87102

2022-2023 High Density Mineral Bond Project
Term Contract
Sub-Bidding
Las Cruces, NM 88001

El Creston MDWCA Water System Improvements Project
Post-Bid
Las Vegas, NM 87701

Water System Improvements - Phase III
Post-Bid
Melrose, NM

Cabresto Road Waterline Replacement
Results
Less than $430,000 est. value
Questa, NM 87556

Old Cavern Area Water Line
Results
Carlsbad, NM

Big Wave Xpress - Storage Building
Addition
Construction
Alamogordo, NM 88310

APS Westside Bus Depot
New Construction - 26,764 SF
Construction
Albuquerque, NM 87121

Gym Commercial Building
New Construction - 82,850 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Carlsbad, NM 88220

Last Updated 08/11/2022 06:02 AM
Project Title

La Cueva MDWCA Water System Improvements Phase 2

Physical Address View project details and contacts
City, State (County) Pecos, NM 87552   (San Miguel County)
Category(s) Commercial, Heavy and Highway, Sewer and Water
Sub-Category(s) Lift and Pump Stations, Maintenance, Site Development, Warehouse/Storage, Water Lines
Contracting Method Competitive Bids
Project Status Construction start expected September 2022
Bids Due View project details and contacts
Estimated Value $675,000 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This project consists of the installation of a public water supply well, a pre-manufactured duplex booster pump station, pre-engineered metal building to house the associated well plumbing manifold, booster station, and chlorination equipment, associated electrical work and controls instrumentation, tank site piping, and site grading improvements. Resident Contractor and Resident Veteran Contractor Preferences shall apply to this Project per Section 13-1-21 NMSA 1978 (as amended).

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Water Utility Pumping Stations, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 34 - Transportation, Operation and Maintenance of Transportation.
Division 40 - Process Integration, Water Process Piping.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents