Similar Projects
Storm Sewer and Street Improvements (West 20th Avenue - Urban Drive To Union Street)
Infrastructure
Bidding
CO 80227

Mainstreet and Twenty Mile Road Intersection Improvements
Infrastructure
Bidding
CO 80138

2020 Santa Fe and Union Concrete Pavement Reconstruction
Post-Bid
Englewood, CO

2021 Citywide Chip Seal and Crack Seal
Post-Bid
$4,000,000 to $4,400,000 est. value
Denver, CO

County Line Road Improvement Project
Results
Less than $2,000,000 est. value
Longmont, CO 80501

Y--Sutey Parking Improvements 2020
Results
$25,000 to $100,000 est. value
Lakewood, CO 80215

Sport Court Resurfacing
Term Contract
Post-Bid
Thornton, CO

Southeast Industrial Offsite Roadway Public Infrastructure Improvements Project
Results
Broomfield, CO 80537

Civil Site Work IDIQ for Interior Region 8
Post-Bid
$25,000 to $500,000 est. value
Glendale, Yuma, AZ

Design Services for 56th Ave. Widening - Peoria to Pena
Results
Denver, CO

Annual Road Grading Maintenance Work
Term Contract
Post-Bid
Kremmling, CO

2020 Road Repair Project
Results
Castle Rock, CO 80108

Notice# 21-20-UCB000275-Site_Asphalt Repairs 2021
Post-Bid
Less than $110,000 est. value
Boulder, CO

2020 Fruita Roundabouts Project
Results
Fruita, CO

R3s6 3/4 " Road Base
Infrastructure
Post-Bid
CO

Last Updated 03/09/2022 09:16 AM
Project Title

Cloman Boulevard Asphalt Surfacing Project

Physical Address View project details and contacts
City, State (County) CO 81147   (Archuleta County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $1,053,286
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project consists of asphalt surfacing of an existing gravel roadway being approximately 1.2 miles of Cloman Boulevard from Piedra Road (CR 600) to the Airport Entrance. One stretch of the road (625 l.f.) will be raised to accommodate larger culverts on a driveway crossing of the adjacent drainage, with the remainder of the road generally maintaining the existing horizontal and vertical alignments. Where the existing alignment is maintained, the project mostly consists of scarification, gravel supplementation, reshaping, and compacting the existing gravel roadway prior to placement of the asphalt surface. Project work includes, but is not limited to clearing and grubbing, excavation, embankment, gravel placement, drainage structures, erosion control, asphalt paving, pavement marking, traffic control, seeding and mulching, and other items typically associated with road construction

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents