Similar Projects
Us 22/322 Pm
Infrastructure
Conception
$2,850,000 est. value

Leatherwood East PM
Infrastructure
Conception
$4,742,462 est. value
New Bethlehem, PA 16242

Sr 1003 - Brady Twp Line To Sr 1001
Alteration
Design
$2,899,132 est. value

Paint Mills Bridge
New Construction, Demolition
Design
$475,284 est. value
PA

Civil and Paving Multiple Award Construction Contract
Term Contract
Bidding
$250,000 to $500,000 est. value
Camp Lejeune, Jacksonville, NC

Superpave Binder Course
Post-Bid
Tionesta, PA

Single Asphalt Seal Coat
Post-Bid
Sligo, PA

SGL 24 Little Coon Road Maintenance Project
Results
Farmington, PA

I 80 Strattenville Resurfacing
Results
$10,000,000 to $12,499,999 est. value
PA

23 WHM SGL 211 Railroad Grade Road Phase 1
Infrastructure
Post-Bid

Double Seal Tar and Chipping
Results
Foxburg, PA

23NW SGL 330 Northern Road Maintenance
Infrastructure
Post-Bid
PA

2021 Road Improvement Project
Results

Asphalt Paving At 8 LNA Sites
Term Contract
Post-Bid

SGL 45 Road Grading Project
Results

Reported 07/20/2022 09:36 AM
Project Title

Single Asphalt Seal Coat, In Place

Physical Address View project details and contacts
City, State (County) Clarion, PA   (Clarion County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method
Project Status Abandoned,
Bids Due View project details and contacts
Estimated Value $200,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Item 1: 6,356 S.y. Single Asphalt Seal Coat, in Place Item 2: 18,803 S.y. Single Asphalt Seal Coat, Crs-2/rs-2 in Place.After 9/15/2022 Liquidated Damages Apply at the Rate of $885.00 Per Calendar Day. Proposals Must Be Upon the Forms Furnished by the Municipality. For Third Class Cities the Bid Must Be Accompanied by a Certified Check or Bid Bond in the Amount of 10% of the Bid, Made Payable to the Municipality. For Other Municipal Types It Is the Discretion of the Municipality. A Performance Bond or Certified Check in the Amount of 100% of the Contract Shall Be Furnished by the Successful Bidder Within 20 Days After the Contract Is Awarded. The Municipality Reserves the Right to Reject Any or All Proposals.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents