Similar Projects
SIUE Health Sciences Building
New Construction - 221,000 SF
Design
Less than $105,370,000 est. value
Edwardsville, IL 62025

Chilled Water Piping Replacement SFC
Renovation, Alteration
Bidding
Edwardsville, IL

Chilled Water Piping Replacement SFC
Renovation, Alteration
Bidding
Edwardsville, IL

HVAC Services - Collinsville
Term Contract
Post-Bid
Collinsville, IL

SIUE 2020 Prequal Statement for Construction
Post-Bid
Edwardsville, IL

Financial Affairs Suite Renovation
Renovation
Results
Edwardsville, IL 62025

Chiller Replacement
Results
Edwardsville, IL 62025

Boiler & Chiller Replacement
Alteration
Bidding
Belleville, Granite City, IL 62220

Re-Bid Insulation Repair Services For Plumbing And Heating, Cooling, Ventilation Systems
Term Contract
Post-Bid
Springfield, IL 62701

Repair Structure and Foundation
Renovation, Infrastructure
Results
Less than $400,000 est. value
Godfrey, IL 62035

HVAC and Mechanical Products
Term Contract
Post-Bid

Renovate and Expand Building/Construct Cold Storage Buildings - Ventilation
Renovation, Addition
Results
Less than $150,000 est. value
Bethalto, Hamel, IL

HVAC and Mechanical Products and Solutions
Term Contract
Post-Bid

Madison School HVAC Modifications
Alteration
Results
Madison, IL 62060

Classroom Equipment and Installation
Renovation, Alteration
Post-Bid
Godfrey, IL 62035

Last Updated 11/03/2021 09:11 AM
Project Title

Morris University Center AHU S-1 Replacement

Physical Address View project details and contacts
City, State (County) Edwardsville, IL 62025   (Madison County)
Category(s) Education, Single Trades
Sub-Category(s) College/University, HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project scope includes but is not limited to: 1. Demolition of existing air handling unit, adjacent ductwork, chilled water piping, heating water piping, electrical and existing pneumatic and electronic controls. 2. Installation of new air handling unit, adjacent ductwork, new chilled water piping and control valve, new heating water piping and control valve, new electrical and VFD and new DDC controls.

Details

College/University, Renovation.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents