Similar Projects
Reconstruction Of Anacua St. & Naranjo Road Paving, Drainage
Post-Bid
Brownsville, TX 78520

Harlingen Line Worker Pole Yard Roadway and Parking
Post-Bid
Harlingen, TX 78550

Southern Region Disaster Recovery Support BPA
Results

Utilities and Paving Improvements
Results
Less than $2,000,000 est. value
Brownsville, TX 78520

NRCS Ditch Repairs North District Area
Post-Bid
TX

Construction of Belden Trail Phase III - 2020 Project
Results
Brownsville, TX 78520

NRCS Ditch Repairs San Benito Area
Post-Bid
TX

Los Fresnos 2019 Street Improvements Project
Results
$850,000 est. value
Los Fresnos, TX

NRCS Ditch Repairs La Paloma Area
Post-Bid
TX

Treasure Hills Zone 1 - Waterline Replacement Project
Results
$4,000,000 est. value
Harlingen, TX 78550

Improvements to South Shore Drive (Cisneros Street to Adams Street)
Post-Bid
Port Isabel, TX 78578

San Roman Road Improvement
Results
Brownsville, TX 78520

Street Improvements Phase II - Island Avenue
Post-Bid
Port Isabel, TX 78578

MFR Water Treatment Plant Roadway Rehabilitation and Extension
Results
Less than $195,375 est. value
Harlingen, TX 78550

Vela Middle School - Bus - Drive Improvements Project
Term Contract
Post-Bid
Brownsville, TX 78521

Reported 03/13/2021 12:00 AM
Project Title

Avenida De La Plata, Elsa, Marvis and San Pedro Paving and Drainage Improvements

Physical Address View project details and contacts
City, State (County) Brownsville, TX 78521   (Cameron County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

All streets, driveways and alleys where applicable shall be kept open to traffic at all times other than when by necessity during the construction of curb and gutter, valley gutters and or other construction operations required, said facilities will be blocked temporarily, but no longer than necessary to complete said operations, as determined by the Engineer. In the event that for any reason a time interval greater than the minimum is needed to complete the construction operation, the Contractor shall set-up traffic control in accordance with the “Manual on Uniform Traffic Control Devices” (latest edition). No direct payment shall be made to the Contractor for any temporary detours which may be needed during the construction of this project.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents