Similar Projects
Last Updated | 02/13/2024 05:34 PM |
Project Title | Food Service Roof Replacement at Fox Lake Correctional Institution |
Physical Address | View project details and contacts |
City, State (County) | Fox Lake, WI 53933 (Dodge County) |
Category(s) | Single Trades |
Sub-Category(s) | Roofing |
Contracting Method | Competitive Bids |
Project Status | Contract Award, Construction start expected January 2024 |
Bids Due | View project details and contacts |
Estimated Value | $1,617,050 [brand] Estimate |
Plans Available from | Agency's Affiliate |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | This project is being let using the single prime bidding and contracting process. DFD will publicly bid the applicable mechanical, electrical, plumbing, and fire protection (MEP) divisions of work first. Within 5 days of the MEP bid opening. DFD will identify a lowest, qualified, responsible, certified bidder in each applicable MEP division of work. These successful MEP bids must be included in all general prime contractor bids received. No later than 5 days after DFD identifies the successful MEP bids, DFD will publicly open general prime contractor bids. General prime contractor bids that do not include the successful MEP bids will be rejected. The state will enter into a single contract with the lowest, qualified, responsible, certified general prime contractor and this general prime contractor will enter into subcontracts with the successful MEP bidders. If a project does not include any mechanical, electrical, plumbing, or fire protection divisions of work, DFD will bid one bid package for all work to general prime contractors. In general, the work consists of the replacement of a mostly gravel surfaced built up asphalt roof with a fully-adhered EPDM roof membrane on the Health Services/Food Services building at Fox Lake Correctional Institution including curbs, flashings, insulation, and other associated components. Add new exterior ladder to project, including security cover Base Bid will be received for: A single lump sum bid for All Work. Bid Guarantee in the amount of 10% of the Bid must accompany each bid submitted Contract offer and construction phase records will be processed electronically on the WisBuild DFD Information System. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |