Similar Projects
Metro Center - Master Plan
New Construction
Design
Aurora, CO 80012

Murphy Creek Parcel 3E South
New Construction, Infrastructure
Design
$7,000,000 CJ est. value
Aurora, CO 80011

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

USCG National Multiple Award Construction Contract (NMACC III)
Term Contract
Post-Bid
$25,000,000 CJ est. value
Seattle, WA 98174

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

On Call Region 1 Asphal Paving Services
Results

Legacy at Metro Center
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Aurora, CO 80011

King Soopers Fuel at Arapahoe Crossing
New Construction, Infrastructure
Pending Verification
$3,000,000 CJ est. value
Aurora, CO 80016

Living Water Express Car Wash
New Construction, Infrastructure
Design
$750,000 CJ est. value
Aurora, CO 80012

Medical Office Shell Building / Aurora
New Construction, Infrastructure - 11,240 SF
Post-Bid
$2,700,000 CJ est. value
Aurora, CO 80015

2021 Capital Improvement Program (CIP) Project in Littleton
Infrastructure
Results
Englewood, CO

RiverPark Mixed-Use Project / Littleton
New Construction, Infrastructure
Pending Verification
$200,000,000 CJ est. value
Littleton, CO 80120

Centennial Medical Plaza Center
New Construction, Renovation, Infrastructure - 61,000 SF
Design
$20,000,000 CJ est. value
Centennial, CO 80112

Canyons Filing 2, 1st Amendment Lot Development Construction Project
Infrastructure
Post-Bid
Centennial, CO

CO-Leadville NFH-Parking Lot Manhole Drain
Term Contract
Results
$25,000 to $100,000 est. value
Leadville, CO 80461

Last Updated 01/12/2023 10:35 PM
Project Title

South Broadway Multimodal Improvements

Physical Address View project details and contacts
City, State (County) Cherry Hills Village, CO 80113   (Arapahoe County)
Category(s) Heavy and Highway, Outdoor Lighting, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Roadway Lighting, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Results, Construction start expected July 2022
Bids Due View project details and contacts
Estimated Value $14,260,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The South Broadway Multimodal Improvements project will construct two-way protected bike lanes from Center Avenue to 7th Ave/Speer Blvd. The project work elements also include signal improvements, ADA improvements, concrete and asphalt paving, signing and striping, drainage and landscaping improvements.Bidders will be charged a fee of $30.00 to submit a bid electronically. PREQUALIFICATION REQUIREMENTS: Each bidder must be prequalified in category 1A Heavy Civil at or above the $12,000,000 monetary level. 12% Disadvantaged Business Enterprise (DBE) + 2240 OJT Hours Est. Value Notes: Between $10,800,000.00 and $11,600,000.00 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline - April 15, 2022 no later than 10:00 a.m. CITY MASTER PROJECT #: 2019-PROJMSTR-0000209

Details

Division 26 - Electrical, Lighting, Exterior Lighting, Lighting Poles and Standards.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents