Similar Projects
2025/26 Stormwater Erosion Control - City of Ames
Infrastructure
Conception
$1,000,000 est. value
Ames, IA

East Industrial Elevated Tank - City of Ames
Infrastructure
Conception
Less than $5,900,000 est. value
Ames, IA 50011

2017/18 Low Point Drainage Improvements - Almond Road
Infrastructure
Results
$500,000 est. value
Ames, IA 50014

2024/25 Low Point Drainage - City of Ames
Alteration
Conception
$400,000 est. value
Ames, IA

2023/24 Storm Water Erosion - City of Ames
Alteration
Conception
$1,250,000 est. value
Ames, IA

CyRide Building Water Main Replacement - City of Ames
Infrastructure
Conception
$750,000 est. value
Ames, IA 50011

Waste Water Treatment - City of Ames
Renovation, Alteration
Conception
$300,000 est. value
Ames, IA 50010

2021/22 Storm Water Facility Rehabilitation - City Of Ames
Alteration
Conception
$150,000 est. value
Ames, IA 50010

2021/22 Concrete Pavement Improvement ( South Kellogg Avenue and 2nd Street)
Infrastructure
Results
$1,031,585 est. value
Ames, IA 50010

2023/24 Low Point Drainage - City of Ames
Infrastructure
Conception
Less than $160,000 est. value
Ames, IA 50010

2023/24 Stormwater Erosion Control - City of Ames
Infrastructure
Conception
Less than $1,000,000 est. value
Ames, IA 50010

2021/22 Clear Water Diversion
Infrastructure
Results
$300,000 est. value
Ames, IA

2019/20 Low Point Drainage (Top O Hollow, 28th, and Kennedy) - City of Ames
Infrastructure
Conception
$200,000 est. value
Ames, IA 50010

2021/22 Stormwater Erosion Control - City of Ames
Alteration
Conception
$522,000 est. value
Ames, IA 50010

Clear Creek Bank Stabilization (North of Oakland Street) - City of Ames
Infrastructure
Conception
Ames, IA 50014

Last Updated 07/14/2022 02:37 PM
Project Title

2022/23 Storm Water Erosion - City of Ames

Physical Address View project details and contacts
City, State (County) Ames, IA   (Story County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This annual program provides for stabilization of areas that have become eroded in streams, channels, swales, gullies, or drainage ways that are part of the storm water system. This program provides a more permanent control of the erosion and will reduce recurring maintenance costs in these areas. The 2022/2023 scope includes: Clear Creek bank stabilization (near 4921 Utah Drive) and Clear Creek bank stabilization (west of British Columbia Avenue) As of February 15, 2021 no new CIP issued, this project is currently in the FY 2020-2025 CIP . Funding for this project is allotted in the city's capital improvement plan for construction Fy 2022. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2022.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents