Similar Projects
Springtown CDBG - Avenue D Reconstruction
Infrastructure
Bidding
$250,000 to $500,000 est. value
Springtown, TX

Bailey Ranch Road Pavement Reconstruction Section 2
Infrastructure
Bidding
Aledo, TX 76008

Annual Asphalt Pavement Resurfacing Services
Term Contract
Post-Bid
Weatherford, TX

San Marcos Aquatic Resources Center - Rehabilitation and Realignment of The Entrance Road
Term Contract
Post-Bid
$1,000,000 to $5,000,000 est. value
San Marcos, TX 78666

Southern Region Disaster Recovery Support BPA
Results

Crack and Joint Sealing
Results
Less than $230,550 est. value
TX

Street Rehabilitation Program
Infrastructure
Bidding
Azle, TX

East Loop Phase III - North Bend Rd to FM 730
Results
Weatherford, TX 76086

Asphalt and Concrete Repairs
Term Contract
Results
Weatherford, TX 76086

East Loop Ph. 5 & 6 US 180 & FM 730 Widening
Results
$1,982,544 est. value
Weatherford, TX 76086

Resurface Roadway
Results
Less than $9,525,875 est. value
TX

Jenkins Road Traffic Safety
Results
TX

Proposed Roadway Construction for Kelly Road Realignment
Results
$787,720 est. value
Aledo, TX 76087

East Loop Ph IV FM 51 to Northbend
Results
Weatherford, TX

Reconstruct Existing Roadway
Results
$1,148,856 est. value
TX

Last Updated 12/02/2021 01:11 AM
Project Title

IH 20 - Nesurface Roadway

Physical Address View project details and contacts
City, State (County) TX   (Parker County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $8,406,525
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

164 6015 Straw/hay Mlch Seed(Perm)(Rural)(Clay) Sy 174.000 1 168 6001 Vegetative Watering Mg 7.000 2 346 6015 Stone-mtrx-asph Sma-d Sac-a Pg76-28 Ton 22,055.000 3 351 6004 Flexible Pavement Structure Repair(8") Sy 5,000.000 4 354 6002 Plan & Text Asph Conc Pav(0" to 2") Sy 191,775.000 5 361 6065 Full-depth Repair Crcp (8"-10") Sy 9,000.000 6 432 6045 Riprap (Mow Strip)(4 in) Cy 344.000 7 438 6001 Cleaning and Sealing Existing Joints Lf 96,224.000 8 438 6004 Cleaning and Sealing Exist Joints(Cl7) Lf 160.000 9 454 6008 Header Type Expansion Joint Cf 28.000 10 500 6001 Mobilization Ls 1.000 11 502 6001 Barricades, Signs and Traffic Handling Mo 7.000 12 506 6004 Rock Filter Dams (Install) (Ty 4) Lf 180.000 13 506 6011 Rock Filter Dams (Remove) Lf 180.000 14 506 6041 Biodeg Erosn Cont Logs (Instl) (12") Lf 430.000 15 506 6043 Biodeg Erosn Cont Logs (Remove) Lf 430.000 16 533 6001 Rumble Strips (Shoulder) Lf 64,890.000 17 540 6001 Mtl W-beam Gd Fen (Tim Post) Lf 5,625.000 18 540 6006 Mtl Beam Gd Fen Trans (Thrie-beam) Ea 8.000 19 540 6016 Downstream Anchor Terminal Section Ea 13.000 20 540 6037 Mtl Bm Gd Fen Trans (Anchor Plate) Ea 8.000 21 542 6001 Remove Metal Beam Guard Fence Lf 5,600.000 22 542 6002 Remove Terminal Anchor Section Ea 12.000 23 542 6003 Remove Downstream Anchor Terminal Ea 2.000 24 542 6004 Rm Mtl Bm Gd Fence Trans (Thrie-beam) Ea 4.000 25 544 6001 Guardrail End Treatment (Install) Ea 13.000 26 544 6003 Guardrail End Treatment (Remove) Ea 12.000 27 644 6004 in Sm Rd Sn Sup&am Ty10bwg(1)sa(T) Ea 7.000 28 644 6030 in Sm Rd Sn Sup&am Tys80(1)sa(T) Ea 2.000 29 644 6051 in Sm Rd Sn Sup&am Tys80(2)sa(P-exal) Ea 2.000 30 644 6076 Remove Sm Rd Sn Sup&am Ea 10.000 31 658 6015 Instl Del Assm (D-sw)sz (Brf)gf1 Ea 140.000 32 658 6028 Instl Del Assm (D-sy)sz (Brf)gf1 Ea 49.000 33 658 6099 Instl Om Assm (Om-2z)(Wflx)gnd Ea 19.000 34 662 6005 Wk Zn Pav Mrk Non-remov (W)6"(Brk) Lf 9,700.000 35 662 6006 Wk Zn Pav Mrk Non-remov (W)6"(Dot) Lf 1,395.000 36 662 6008 Wk Zn Pav Mrk Non-remov (W)6"(Sld) Lf 39,602.000 37 662 6012 Wk Zn Pav Mrk Non-remov (W)8"(Sld) Lf 7,108.000 38 662 6014 Wk Zn Pav Mrk Non-remov (W)12"(Sld) Lf 2,100.000 39 662 6017 Wk Zn Pav Mrk Non-remov (W)(Arrow) Ea 6.000 40 662 6029 Wk Zn Pav Mrk Non-remov(W)(Word) Ea 11.000 41 662 6037 Wk Zn Pav Mrk Non-remov (Y)6"(Sld) Lf 39,602.000 42 662 6064 Wk Zn Pav Mrk Remov (W)6"(Brk) Lf 9,700.000 43 662 6065 Wk Zn Pav Mrk Remov (W)6"(Dot) Lf 1,395.000 44 662 6067 Wk Zn Pav Mrk Remov (W)6"(Sld) Lf 39,602.000 45 662 6071 Wk Zn Pav Mrk Remov (W)8"(Sld) Lf 7,108.000 46 662 6073 Wk Zn Pav Mrk Remov (W)12"(Sld) Lf 2,100.000 47 662 6080 Wk Zn Pav Mrk Remov (W)(Arrow) Ea 6.000 48 662 6090 Wk Zn Pav Mrk Remov (W)(Word) Ea 11.000 49 662 6098 Wk Zn Pav Mrk Remov (Y)6"(Sld) Lf 39,602.000 50 666 6018 Refl Pav Mrk Ty I (W)6"(Dot)(100mil) Lf 1,178.000 51 666 6036 Refl Pav Mrk Ty I (W)8"(Sld)(100mil) Lf 6,918.000 52 666 6039 Refl Pav Mrk Ty I (W)12"(Lndp)(100mil) Lf 4,734.000 53 666 6042 Refl Pav Mrk Ty I (W)12"(Sld)(100mil) Lf 4,250.000 54 666 6054 Refl Pav Mrk Ty I (W)(Arrow)(100mil) Ea 6.000 55 666 6075 Refl Pav Mrk Ty I (W)(Number)(100mil) Ea 5.000 56 666 6078 Refl Pav Mrk Ty I (W)(Word)(100mil) Ea 6.000 57 666 6306 Re Pm W/ret Req Ty I (W)6"(Brk)(100mil) Lf 9,800.000 58 666 6309 Re Pm W/ret Req Ty I (W)6"(Sld)(100mil) Lf 40,380.000 59 666 6321 Re Pm W/ret Req Ty I (Y)6"(Sld)(100mil) Lf 40,156.000 60 672 6010 Refl Pav Mrkr Ty Ii-c-r Ea 1,588.000 61 3076 6038 D-gr Hma Ty-d Pg64-22 (Level-up) Ton 2,206.000 62 3085 6001 Underseal Course Gal 38,355.000 63 6001 6002 Portable Changeable Message Sign Ea 2.000 64 6185 6002 Tma (Stationary) Day 113.000 65 6185 6005 Tma (Mobile Operation) Day 22.000 66

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents