Similar Projects
Alki Permanent Standby Generator
Alteration
Design
$6,000,000 est. value
WA

Electrical Preventative On-Call Maintenance Services
Term Contract
Sub-Bidding
Seattle, WA 98164

Medina Pump Station MCC and Generator Replacement
Renovation, Alteration
Post-Bid
$2,300,000 est. value
Medina, WA 98039

Electrical Construction Work Order 2021-2022
Term Contract, Alteration
Post-Bid
WA

Bellevue Library Elevator Modernization for Car #3
Alteration
Results
Bellevue, WA 98007

Deception Creek Line Extension
Infrastructure
Results
$2,235,825 est. value
WA

Auxiliary Utility Facility Generator Maintenance
Term Contract, Alteration
Post-Bid
Seattle, WA

Lakeland Hills Pump Station Generator Install
Renovation, Alteration
Results
$1,190,000 est. value
Auburn, WA 98092

Fire Alarm and Electrical Power Improvements at Franklin High School Gym Building
Alteration
Post-Bid
Seattle, WA 98144

Lake City Land Banked Site Park
Demolition, Infrastructure, Alteration
Results
Seattle, WA 98125

Roof Replacements and Repair Construction Work Order - REBID
Alteration
Post-Bid
WA

Rattlesnake Wells Auxiliary Generator Replacement
Alteration
Results
North Bend, WA

Electrical Work Order Contract
Term Contract, Alteration
Post-Bid
WA

District Wide Tunable Lighting Upgrades - Phase I
Alteration
Results
$118,220,400 est. value
Renton, WA

Installation of a Backup Generator Power System for Eastside Fire and Rescue Station
Alteration
Post-Bid
Issaquah, WA

Last Updated 08/30/2022 03:01 AM
Project Title

Electrical On-Call Portwide 2022-4 and 2022-5

Physical Address View project details and contacts
City, State (County) Seattle, WA 98164   (King County)
Category(s) Single Trades
Sub-Category(s) Electric
Contracting Method Competitive Bids
Project Status Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $300,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The work includes but is not limited to the following: Electrical work for various locations at SeaTac International Airport and Seaport properties. Within 72 hours (3 business days) of receiving written request from the Port of Seattle, the Contractor shall furnish all cost estimates, which shall contain estimates for labor, tools, equipment, materials and incidentals necessary to perform work as required by the Work Authorization (WA). The Port is anticipating a large demand for electrical small projects in the next few years. The Port intends to award two contracts from this solicitation to enable us to quickly execute the work and to ensure enough capacity by having 2 different contractors available. The contracts shall be awarded to the lowest responsive and responsible bidders. WMBE Aspirational Goal for Overall Project: None (small and WMBE businesses encouraged to pursue as prime)

Details

Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents