Similar Projects
Roadwork
Infrastructure
Bidding
Bloomer, WI

2021 LRIP Road Improvements
Post-Bid
New Auburn, WI 54757

Lift to Road
Infrastructure
Post-Bid
Bloomer, WI

Airfield Paving Construction MATOC
Results
Less than $400,000,000 est. value

Anson 105th Avenue Resurfacing
Results
Jim Falls, WI

Culvert Installation
Infrastructure
Post-Bid
WI 54724

C. Chippewa Falls, Seymour Cray SR Blvd., CTH I Intersection
Results
Chippewa Falls, Seymour, WI

Road Work
Infrastructure
Post-Bid
Bloomer, WI 54724

Spring and River Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Crack Sealing
Infrastructure
Post-Bid
Bloomer, WI 54724

Cedar Street Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Bloomer - Cornell, North Junction STH 40 to CTH E; Bloomer - Bruce, 13th Avenue to East Junction STH 64
Infrastructure
Post-Bid
Bloomer, Cornell, WI

Bridgewater Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Twin Valley Road Improvements
Infrastructure
Post-Bid

Irvine Street and Summit Avenue Utility and Street Improvement
Results
Chippewa Falls, WI 54729

Reported 04/15/2022 12:00 AM
Project Title

Blacktop

Physical Address View project details and contacts
City, State (County) Holcombe, WI   (Chippewa County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Bidding, Construction Start Expected May 2022
Bids Due View project details and contacts
Estimated Value
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

for the following roadwork project. Project 1: 290th Ave., 2" lift, pulverize, blacktop and shoulder from Cty. Hwy. E west to the Town Line, approximately 3 miles. Project 2: 290th Ave., 2" cold mix overlay with 2' shoulders from Cty. Hwy. E west to Town Line, (approx. 3 miles) Project 3: 250th St., chip seal with 1/4 fractured granite and hot oil from Cty. Hwy. M north to 290th Ave. (2 miles).

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents