Similar Projects
16 Potable Pipe Crossing of Fountain Creek
Post-Bid
Pueblo, CO

City Wide Lead Service Line Replacement 2020
Results
Pueblo, CO

2020 Selenium Reduction Project
Results
Pueblo, CO 81001

City Wide Main Renewals 2020 PN 205104
Term Contract
Results
Less than $2,000,000 est. value
Pueblo, CO 81002

4610--VHA Mar Cor Reverse Osmosis Water Purification BNOE | Sources Sought | 36U10120Q0029
Results

Six-Month Contract for PVC Water Distribution Pipe
Term Contract
Results
Pueblo, CO 81002

Supply of Kupferle Sampling Stations 2020
Results
$5,000 to $10,000 est. value
CO

Annual Contract for Water Meters - 1 /2" and 2"
Term Contract
Results
Pueblo, CO 81002

Annual Contract for Water Meters - 3/4" and 1"
Term Contract
Results
Pueblo, CO 81002

Annual Contract for Compound Water Meters
Term Contract
Results
$30,000 to $35,000 est. value
Pueblo, CO 81002

2020 Northside Service Line Potholing
Results
Pueblo, CO 81002

Annual Contract for Turbine Water Meters
Term Contract
Results
Less than $57,556 est. value
Pueblo, CO 81003

Resilient Seated Gate Valves 2020
Term Contract
Results
Pueblo, CO 81002

Tapping Sleeves 2020
Term Contract
Results
Pueblo, CO 81002

Fire Hydrants 2020
Term Contract
Results
Pueblo, CO 81002

Last Updated 04/24/2021 01:29 AM
Project Title

Platteville Boulevard Dry Creek Crossing

Physical Address View project details and contacts
City, State (County) Pueblo, CO 81007   (Pueblo County)
Category(s) Sewer and Water
Sub-Category(s) Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

In general, this project will consist of but not limited to the construction of a new C900 PVC potable waterline, hydrants, valves, tie-ins, and appurtenances between Limon Dr. and Winona Dr. north of Platteville Blvd, installed by open trench method. The project will tie in to an existing 8-inch diameter waterline located off Limon Dr. and extend approximately 1,510 feet to Winona Dr. All materials excluding hydrant assemblies as indicated on the drawings will be provided by the contractor and must be installed, along with the completion of all associated site work relating to the new potable waterline.

Details

Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents