Similar Projects
New Riverside Barn Park - Phase I Site Development
Infrastructure
Bidding
$330,000 CJ est. value
Bluffton, SC 29910

Cherokee - Lake Thicketty Restroom Building
Renovation
Bidding
$60,000 CJ est. value
Gaffney, SC 29341

Elko Street Demolition
Term Contract, Demolition, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Williston, SC 29853

Hull/Powers Transformer and Switch Replacement
Renovation
Sub-Bidding
$360,000 CJ est. value
Spartanburg, SC 29306

State Site Assessment and Remediation Program
Post-Bid
Columbia, SC

Sewer Camera
Alteration
Post-Bid
$60,000 est. value
Fountain Inn, SC

Certified Testing Of Chilled Water Loop
Results
Columbia, SC

Single Family Home Abatement
Results
Moore, SC 29369

Dorchester Commerce Center
New Construction, Infrastructure - 216,320 SF
Pending Verification
$23,000,000 CJ est. value
Summerville, SC 29483

Dorchester Commerce Center
New Construction, Infrastructure - 533,280 SF
Pending Verification
$57,000,000 CJ est. value
Summerville, SC 29483

Campus Village Residential Development-Off-Site Parking-Abatement & Building Demolition
Term Contract, Demolition, Infrastructure
Sub-Bidding
$700,000 CJ est. value
Columbia, SC 29201

Environmental Services
Term Contract
Post-Bid
Less than $500,000 est. value
Washington, DC

Asbestos Abatement, Demolition, and Disposal of 13 Regulated Structures
Demolition, Alteration
Results
North Charleston, SC

Asbestos Abatement
Term Contract, Infrastructure
Sub-Bidding
$20,000 CJ est. value
Anderson, SC 29621

Asbestos Abatement Services
Alteration
Post-Bid
Marion, SC 29571

Last Updated 09/13/2022 04:16 PM
Project Title

Harlem Blue Pond Neighborhood Demolition

Physical Address View project details and contacts
City, State (County) Bishopville, SC 29010   (Lee County)
Category(s) Single Trades
Sub-Category(s) Environmental
Contracting Method Competitive Bids
Project Status Results, Construction start expected August 2022
Bids Due View project details and contacts
Estimated Value $70,700 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Bishopville will accept separate sealed bids for the complete demolition and disposal of Twenty-Three (23) residential structures that CONTAIN ASBESTOS, within the city of Bishopville. This project is being funded in whole/in part by the Community Development Block Grant Program. All federal CDBG requirements will apply to the contract. The CDBG Special Contract Provisions will apply. All contractors are required to be registered in the federal System for Award Management. Project Location: Bishopville, South Carolina 1. The contractor will be responsible for demolition, removal, and proper disposal of structures and contents of existing vacant residential buildings. The list of structures to be demolished is included as AttachmentA. 2. The contractor will be responsible for all costs of transport and proper disposal of demolition debris, both Asbestos Containing material and non-Asbestos Containing material. 3. The Contractor will provide a complete compliance history and documentation of site procedures in relation to the abatement and disposal of asbestos and nonasbestos containing materials. 4. The contractor will be responsible for all landfill fees for asbestos containing material. Landfill tickets must be submitted with all invoices in order for payment to be processed. Landfill tickets must clearly show the address and Parcel Number. Demolition for properties must be completed, no partial payment request will be accepted. 5. The contractor will be responsible for obtaining all certifications and permits necessary for the completion of the project from the applicable regulatory agencies. 6. The contractor will be responsible for demolition of all slabs and all underground structures to a depth of two feet below existing finish floor grade. Approved material shall be placed as backfill in all excavated areas and graded to the elevation necessary to provide positive surface drainage to all areas of the site. 7. The contractor is responsible for removing all debris and trash from the entire lot, and the entire lot is to be left in a clean, properly graded, seeded state. Exception for those lots that have multiple units. In this case the area with the unit to be demolished will be cleared according to the discretion of the City of Bishopville. 8. The contractor is responsible for removing all slabs, walkways, driveways, fences, and accessory buildings. 9. The contractor is responsible for all temporary facilities necessary to successfully complete the project to include, but not limited to, portable restrooms, temporary power, temporary water, silt fencing, site security, etc. 10. Caution and care must be exercised to prevent damage to adjacent structures, and to ensure that existing businesses can operate normally without significant disruption during demolition activities. 11. Caution and care must be taken to ensure mature trees are not removed or damaged. 12. The Contractor must comply with SCDHEC Regulation 61-86.1 - "Standards of Performance for Asbestos Projects". 13. All required Air Monitoring during asbestos abatement has been contracted separately and is not the responsibility of the contractor retained under this RFB Clearings Backfill and Compilation Page 3 of 6 1. The contractor shall secure any necessary permits from local agencies and submit notifications to the Health Hazards Control Branch, as applicable, to include a Demolition Permit, any required Tree Permit and a Business License, as applicable. 2. For installation of sediment and erosion control devices, practices, and structures, per current SCDHEC and SCDOT standards. 3. Depressions greater than six inches created by the demolition and removal of items specified must be graded level with adjacent land, as directed by the City of Bishopville. All areas where items specified have been demolished and/or removed, will be seeded as directed by the City of Bishopville. 4. Upon completion of the assigned work, the contractor will provide written verification that all structures have been removed 1. Bringing site to proper grade shall be part of the base bid. Contractor shall bring finished grade to match the sidewalks or to existing materials on all sides of the site. Contractor shall slope finish grade to drain. 2. It is expected that the Contractor will backfill all excavated areas with suitable material, and grade the area to provide for positive surface drainage for the entire site (generally, 0.5% minimum slope from the highest point of adjacent road, curb or sidewalk) 3. Fill shall be for counties classified as Group B per SCDOT standard, section 203.2....1.8, #15. The following soil types are acceptable for use as backfill material in accordance with AASHTO M 145. They are as follows: A-l, A-2, A-3, A4, and A-5. Each layer shall be spread evenly and compacted. Each layer of backfill and the top eight inches of material shall be compacted by approved equipment and the density shall be 98% as determined by the Standard Proctor Test. 4. The Contractor will be responsible for re-seeding the site with appropriate seasonal grass for erosion control, as directed by the City of Bishopville. 5. The Contractor will be responsible for installation of silt fence at the edge of curb or sidewalk to prevent sediment runoff. The Contractor will be responsible for repair of damage to any adjacent structures, and any curbing, sidewalk, or asphalt damaged during the project. 6. Should unacceptable material such as muck, building debris or other unsuitable material be discovered, Contractor shall notify the City of Bishopville before proceeding with work. Borrow material shall be required to meet the SCDOT standard specifications for roadways and structures. Placement and compaction will be directed by the City of Bishopville

Details

Division 01 - General Requirements, Special Procedures, Environmental Procedures.
Division 02 - Existing Conditions, Environmental Assessment, Hazardous Material Assessment, Site Remediation, Asbestos Remediation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents