Similar Projects
Culvert Replacement Asset PA2287 at 5000 Todd Road
Design
Indianapolis, IN 46237

BL000A Site-Campus River Restoration
Infrastructure
Bidding
Bloomington, IN 47405

Small Structure Pipe Lining
Infrastructure
Bidding
IN

Mississinewa Lake Mowing and Maintenance IDIQ
Post-Bid
Peru, IN 46970

Valparaiso TOD Landscaping
Post-Bid
Valparaiso, IN 46383

Small Structure Pipe Lining
Results
IN

Deep River Rock Riffle Improvements
Renovation
Results
Lake Station, IN 46405

Springfield Road Culvert Replacement
Construction
Mount Vernon, IN

Ream Creek Drain Reconstruction, Orchard Park Arm
Infrastructure
Bidding
IN

Tree Removal Scattered Sites
Post-Bid
East Chicago, IN 46312

Polymer Precoated Corrugated Steel Pipe and Couplings
Results
Indianapolis, IN 46077

Regulated Drain Maintenance/Repair
Infrastructure
Bidding
IN

Trench Box Rental
Post-Bid
Indianapolis, IN 46077

2020 Addison Street Drainage Improvements
Renovation
Results
Crown Point, IN 46307

Big Cicero Creek Bank Stabilization
Infrastructure
Bidding
Tipton, IN

Reported 08/07/2021 12:00 AM
Project Title

Yellow River Bank Reconstruction and Sediment Mitigation Phase I

Physical Address View project details and contacts
City, State (County) Culver, IN   (Marshall County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Landscaping/Irrigation, Shoreline/Erosion/Drainage
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

This construction project is the first of two parts of the PHASE 1 - YELLOW RIVER BANK RECONSTRUCTION AND SEDIMENT MITIGATION. This PHASE I – MARSHALL COUNTY CONSTRUCTION consists of stabilizing approximately 1,850 linear feet of the Yellow River in Marshall County near the Marshall/Starke County Line. Construction activities will include clearing, tree removal and, channel and bank grading, structure installation, planting, seeding, and erosion control blanket installation.

Details

Division 31 - Earthwork, Erosion and Sedimentation Controls.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Irrigation, Planting Irrigation, Planting, Planting Preparation, Soil Preparation, Landscape Grading.
Division 33 - Utilities, Storm Drainage Utilities, Ponds and Reservoirs.
Division 35 - Waterway and Marine Construction, Shoreline Protection, Waterway Construction and Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents